Skip to main content

First deck span completed for Mersey Gateway's north approach viaduct

The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.
February 12, 2016 Read time: 2 mins

The 6126 Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed.

The reinforced concrete deck span was revealed when Merseylink's movable scaffolding system (MSS) 'Trinity' moved to its second casting position. It is the first of 11 spans that will be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.

The MSS, which acts as a giant concrete mould, was specially designed for the Mersey Gateway Project. It is being used to build the two elevated approach viaducts over the Mersey estuary.

The span connects the beginning of the approach viaduct from the north abutment in Widnes to the first supporting pier. It measures around 60m long and 18m wide and is angled at 5 degrees to allow vehicles to travel safely around the curve of the approach road.

Construction teams worked around the clock to get the span ready. This involved pouring 1,146m3 of concrete into the MSS non-stop over 34 hours.


"This is a real achievement for the project and a milestone that we've been looking forward to with anticipation,” said Declan Cannar, Merseylink's general foreman in charge of the MSS operation. “We're now busy preparing the MSS so it's ready to cast the next section."

The approach viaduct deck is being constructed in three phases. The deck spans are constructed first by the MSS, then a deck slab is built on top of the span, and finally the outer deck or ‘wings' are built by a wing traveller machine to provide the full six lane width of the approach road.

The MSS has moved to its second casting position ready for work to begin on the next span, which will be cast in March.

View Trinity in action by clicking here.
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.merseygateway.co.uk/live-view Visit www.merseygateway.co.uk/live-view false http://www.merseygateway.co.uk/live-view false false%>

For more information on companies in this article

Related Content

  • Top Glass CAB
    January 6, 2017
    CAB Glazing Services (CGS) is exhibiting at Intermat 2012 its latest range of glass for OEM brands, machinery dealers, spare part companies and end users as it looks to further broaden its customer base. CGS says it produces glass that meets or exceeds international quality assurance standards, therefore offering customers the best product available. The company stock thousands of curved and flat glasses, so many items are available from stock with zero lead times. Darren Kivlin, partner at CAB Glazing Serv
  • Top Glass CAB
    April 13, 2012
    CAB Glazing Services (CGS) is exhibiting at Intermat 2012 its latest range of glass for OEM brands, machinery dealers, spare part companies and end users as it looks to further broaden its customer base. CGS says it produces glass that meets or exceeds international quality assurance standards, therefore offering customers the best product available. The company stock thousands of curved and flat glasses, so many items are available from stock with zero lead times. Darren Kivlin, partner at CAB Glazing Serv
  • Atlas Copco’s strategic agreement with Wuxi Drilling Tools Factory
    January 6, 2017
    Atlas Copco has entered a strategic partnership with Wuxi Drilling Tools Factory (WTDF) in a bid to increase its impact in the Chinese exploration drilling equipment market. The move, which was officially recognised in a signing ceremony at bauma China 2012, will see WDTF sell DCDMA standard Atlas Copco exploration drilling rigs in China. In exchange, the Swedish mining and quarrying equipment giant will sell WDTF’s range of GB standard exploration drilling tools. Speaking prior to the official strategic pa
  • Atlas Copco’s strategic agreement with Wuxi Drilling Tools Factory
    November 28, 2012
    Atlas Copco has entered a strategic partnership with Wuxi Drilling Tools Factory (WTDF) in a bid to increase its impact in the Chinese exploration drilling equipment market. The move, which was officially recognised in a signing ceremony at bauma China 2012, will see WDTF sell DCDMA standard Atlas Copco exploration drilling rigs in China. In exchange, the Swedish mining and quarrying equipment giant will sell WDTF’s range of GB standard exploration drilling tools. Speaking prior to the official strategic pa