Skip to main content

Fire damage closes bridge over UK's M1 motorway

Following a fire at a scrapyard under the motorway (one of Britain’s busiest) in April, extensive investigation, assessment and structural reinforcement work has taken place non-stop.
February 22, 2012 Read time: 1 min
A UK Highways Agency photograph shows the metal support structure below the M1 after the fire damage. (David Townend Photography).
WHILE ALL three lanes in both directions are now open between junctions 1 and 4 on the M1 motorway, north of London, UK, further closures will be required.

Following a fire at a scrapyard under the motorway (one of Britain’s busiest) in April, extensive investigation, assessment and structural reinforcement work has taken place non-stop.

An 80km/hour speed limit is in force over the viaduct for safety reasons.

The 1441 UK Highways Agency says that it is likely there will be a need for further closures to enable permanent repair work to be undertaken. This will be planned to minimise disruption as far as possible.

For more information on companies in this article

Related Content

  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.
  • Focusing on workzone safety systems
    March 16, 2012
    The US has seen a major reduction in deaths following accidents in its highway construction work zones, while Europe and other parts of the world are looking at new safety technology and systems to trigger a similar trend. Guy Woodford reports. Work in the US to reduce the likelihood of potentially fatal accidents at highway work zones is paying dividend.
  • Motorway's tricky cable installation
    February 6, 2012
    The UK is now benefiting from the installation of sophisticated automated traffic management equipment and information signs on its motorway network. But with heavy traffic volumes on these roads, novel techniques have had to be implemented. One such operation, organised by client The Highways Agency and its consulting engineer A.One+, has recently been underway on the M56 motorway between Junctions 9 and 16 in north-west England under the Triple Package Advanced Works designation. To minimise traffic distu
  • Nepal link benefits from Japanese funding
    February 29, 2012
    Road improvements on the key Tinkune-Jadibuti road in Nepal are now complete, with an official opening of the route having taken place.