Skip to main content

Fire damage closes bridge over UK's M1 motorway

Following a fire at a scrapyard under the motorway (one of Britain’s busiest) in April, extensive investigation, assessment and structural reinforcement work has taken place non-stop.
February 22, 2012 Read time: 1 min
A UK Highways Agency photograph shows the metal support structure below the M1 after the fire damage. (David Townend Photography).
WHILE ALL three lanes in both directions are now open between junctions 1 and 4 on the M1 motorway, north of London, UK, further closures will be required.

Following a fire at a scrapyard under the motorway (one of Britain’s busiest) in April, extensive investigation, assessment and structural reinforcement work has taken place non-stop.

An 80km/hour speed limit is in force over the viaduct for safety reasons.

The 1441 UK Highways Agency says that it is likely there will be a need for further closures to enable permanent repair work to be undertaken. This will be planned to minimise disruption as far as possible.

For more information on companies in this article

Related Content

  • Speedy repair for key UK motorway
    October 2, 2014
    Major road repairs have been carried out on the UK’s busy M25 motorway. Stirling Lloyd's Safetrack Crack Infill is helping to reinstate major sections of London's M25 orbital motorway.
  • Responsive roadsign developed by student
    August 22, 2013
    A UK student hopes his new lenticular road signs which ‘pulse’ at drivers will lead to a revolution in the way motorists are given information on the roads. Meanwhile, a leading road marking firm is helping keep tourists safe in a spiritually significant town in Umbria, Italy. Guy Woodford reports You may think Charles Gale’s vision of creating the first ‘pulsing’ lenticular road sign was the result of months, even years, spent studying traffic and driver behaviour on the roads of his adopted student c
  • First bridge deck section joined on UK’s Mersey Gateway project
    June 30, 2017
    The Mersey Gateway bridge project near Liverpool in England passed a milestone recently with the first joining of two of the deck sections.
  • Bridge demolition easier with modern machines
    February 23, 2012
    The speedy and safe removal of old or unwanted structures is made easier with modern, sophisticated equipment, Patrick Smith reports. The power and versatility of modern demolition tools and machines was demonstrated when a bridge was removed overnight as part of a motorway widening project.