Skip to main content

Fire damage closes bridge over UK's M1 motorway

Following a fire at a scrapyard under the motorway (one of Britain’s busiest) in April, extensive investigation, assessment and structural reinforcement work has taken place non-stop.
February 22, 2012 Read time: 1 min
A UK Highways Agency photograph shows the metal support structure below the M1 after the fire damage. (David Townend Photography).
WHILE ALL three lanes in both directions are now open between junctions 1 and 4 on the M1 motorway, north of London, UK, further closures will be required.

Following a fire at a scrapyard under the motorway (one of Britain’s busiest) in April, extensive investigation, assessment and structural reinforcement work has taken place non-stop.

An 80km/hour speed limit is in force over the viaduct for safety reasons.

The 1441 UK Highways Agency says that it is likely there will be a need for further closures to enable permanent repair work to be undertaken. This will be planned to minimise disruption as far as possible.

For more information on companies in this article

Related Content

  • Finnish Motorway Finally finished: Finland's M1
    July 23, 2012
    It has taken a long time to complete, but a vital motorway link is open to traffic as Heikki Harri reports After almost 50 years of construction, the M1 motorway linking Helsinki, the Finnish capital city and Turku, the country's old capital in the southwest, is finally completed. It did not take all 50 years of construction but the first section from Helsinki towards the west was constructed in the mid -1960s. Then there was a pause until mid-1990s when the works resumed section by section. The final sect
  • Simple road safety measures save lives
    February 15, 2012
    Elementary road safety measures quickly pay back the costs of investment and, more importantly, help save lives as Patrick Smith reports. More than 300 people in the UK are alive today or have avoided the prospect of a lifetime of special care because just 15 roads have had simple improvements put in place.
  • Carillion wins UK M6 managed motorway contract
    May 3, 2012
    Carillion has been awarded a US$16 million contract to transform another section of the UK’s M6 in Birmingham, between Junctions 5 and 8, into a managed motorway.
  • Carillion wins UK M6 managed motorway contract
    March 22, 2012
    Carillion has been awarded a US$16 million contract to transform another section of the UK’s M6 in Birmingham, between Junctions 5 and 8, into a managed motorway.