Skip to main content

Final touches for Seattle’s SR520 floating bridge

Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane
November 21, 2017 Read time: 2 mins
Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge.

The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest.

It opened in April last year as a replacement for the original 50-year-old four-lane Evergreen Point Floating Bridge which was 40m shorter. The new US$751 million bridge has six lanes of traffic as well as a 4.26m-wide separate pedestrian and cycling path. Recent work includes trail railing and lighting, drainage systems and trail connections on land to enhance the safety and modality of the structure and connect it to a system of paths and trails in the surrounding area.

World Highways, in a key project report in 2014, reviewed construction of the toll bridge that floats on 77 concrete pontoons, compared to 33 for the original bridge. The longest pontoons are 109m and are 22.86m wide and 8.53m high. Among them are 21 of the heaviest, widest and deepest longitudinal pontoons ever built, each weighing nearly 10,000tonnes.

There are 54 supplemental pontoons allowing the structure to withstand winds of up to nearly 160kph and nearly 2m-high waves – estimated to occur in the Puget Sound area every 100 years.

The American Council of Engineering Companies (ACEC) recently bestowed the 2017 Grand Conceptor Award upon the bridge for being “the nation’s best overall engineering achievement”. The ACEC considered 162 projects from all over the world for the award. General engineering consultant on SR 520 project was HDR while Kiewit/General/Manson was the bridge’s design-builder. Lead design consultant was KPFF.

Related Content

  • São Paulo State Highway Authority wins the Evonik Road Safety Award 2018
    April 23, 2019
    For more than 50 years, Evonik – a world leader in specialty chemicals and the inventor of MMA cold plastic road markings - has been at the forefront of efforts to improve road safety and disseminate best practices in the field On 18th December 2018, Evonik bestowed the 3rd edition of the “Evonik Road Safety Award” in the city of São Paulo, Brazil. The Road Safety Award is designed to support sustainable road safety initiatives, as part of the company’s corporate and social responsibility. It acknowle
  • Texas Interstate connection upgrade project
    January 31, 2018
    Consultancy firm Michael Baker International has a US$4 million contract from the Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.
  • LA’s Ribbon of Light viaduct cast into darkness
    January 10, 2024
    Thieves have been pulling copper wiring out of electrical boxes Los Angeles’ 6th Street Viaduct and selling it for scrap, prompting police to report that “the Grinch stole all the Christmas lights”.
  • Smaller contractors wanted for Melbourne’s North East Link project
    September 27, 2018
    Australia’s Victoria state government has moved to ensure smaller contractors get a share of the US$12 billion worth of Melbourne city’s North East Link contracts. According to a report in the Australian Financial Review, Victoria state treasurer Tim Pallas said that consortiums bidding for North East Link could not include more than one of the top three local contractors. This is to encourage more international companies and smaller Australian contractors to tender for the proposed 26km project.