Skip to main content

Final touches for Seattle’s SR520 floating bridge

Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane
November 21, 2017 Read time: 2 mins
Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge.

The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest.

It opened in April last year as a replacement for the original 50-year-old four-lane Evergreen Point Floating Bridge which was 40m shorter. The new US$751 million bridge has six lanes of traffic as well as a 4.26m-wide separate pedestrian and cycling path. Recent work includes trail railing and lighting, drainage systems and trail connections on land to enhance the safety and modality of the structure and connect it to a system of paths and trails in the surrounding area.

World Highways, in a key project report in 2014, reviewed construction of the toll bridge that floats on 77 concrete pontoons, compared to 33 for the original bridge. The longest pontoons are 109m and are 22.86m wide and 8.53m high. Among them are 21 of the heaviest, widest and deepest longitudinal pontoons ever built, each weighing nearly 10,000tonnes.

There are 54 supplemental pontoons allowing the structure to withstand winds of up to nearly 160kph and nearly 2m-high waves – estimated to occur in the Puget Sound area every 100 years.

The American Council of Engineering Companies (ACEC) recently bestowed the 2017 Grand Conceptor Award upon the bridge for being “the nation’s best overall engineering achievement”. The ACEC considered 162 projects from all over the world for the award. General engineering consultant on SR 520 project was HDR while Kiewit/General/Manson was the bridge’s design-builder. Lead design consultant was KPFF.

Related Content

  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • Lane Construction to carry out Florida highway deal
    November 24, 2017
    Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco
  • Preparing a raceway with milling machinery
    November 6, 2018
    Contractor Continental Milling has played an important role in refurbishing the famous Pikes Peak Highway route in the US state of Colorado Working as a subcontractor for the Kiewit Corporation on the mill and overlay project, the Continental Milling crew was responsible for milling patches up to 213.4m long on the winding, two-lane highway known for its switchback turns and scenic vistas. The work was needed to prepare the route for the annual Pikes Peak International Hill Climb. Pikes Peak Highway fea
  • Efficient sealcoating claimed by Neal Manufacturing
    October 20, 2017
    Neal Manufacturing is introducing a new sealcoating baffle attachment that is said to boost efficiency. A division of Blastcrete Equipment, Neal Manufacturing has designed its DA 350 Dual Applicator so that it can be retrofitted onto any truck-powered sealcoating unit. The piece of equipment can be used to automatically cut-in sealcoat materials on the go, while keeping curbs and edges free of material. The unit can be paired with Neal’s high-powered blower to further increase sealcoat preparation product