Skip to main content

Final touches for Seattle’s SR520 floating bridge

Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane
November 21, 2017 Read time: 2 mins
Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge.

The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest.

It opened in April last year as a replacement for the original 50-year-old four-lane Evergreen Point Floating Bridge which was 40m shorter. The new US$751 million bridge has six lanes of traffic as well as a 4.26m-wide separate pedestrian and cycling path. Recent work includes trail railing and lighting, drainage systems and trail connections on land to enhance the safety and modality of the structure and connect it to a system of paths and trails in the surrounding area.

World Highways, in a key project report in 2014, reviewed construction of the toll bridge that floats on 77 concrete pontoons, compared to 33 for the original bridge. The longest pontoons are 109m and are 22.86m wide and 8.53m high. Among them are 21 of the heaviest, widest and deepest longitudinal pontoons ever built, each weighing nearly 10,000tonnes.

There are 54 supplemental pontoons allowing the structure to withstand winds of up to nearly 160kph and nearly 2m-high waves – estimated to occur in the Puget Sound area every 100 years.

The American Council of Engineering Companies (ACEC) recently bestowed the 2017 Grand Conceptor Award upon the bridge for being “the nation’s best overall engineering achievement”. The ACEC considered 162 projects from all over the world for the award. General engineering consultant on SR 520 project was HDR while Kiewit/General/Manson was the bridge’s design-builder. Lead design consultant was KPFF.

Related Content

  • Trail blazing for the Gordie Howe Bridge
    February 23, 2024
    Gordie Howe International Bridge between Canada and the US will become the first international bridge to link national trail systems across the border.
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas
  • Acrow supplies temporary bridge during Turcot Interchange project
    June 28, 2018
    Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada. The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years. The Turcot Interchange is a three-level stack freeway int
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).