Skip to main content

Ferrovial consortium secure US$344.39mn Oman motorway construction deal

The Government of Oman has awarded the Ferrovial-Federici Stirling Batco consortium a US$344.39 million (OMR 132.6 million) contract to construct a 41km section of Oman’s Batinah Expressway. According to an Oman national newspaper the package, the fifth of six construction packages associated with the project includes three major bridge works taking the expressway across large wadis. The bridges will contain as many as 20 spans - each with a length of up to 40m.
August 27, 2013 Read time: 1 min
The Government of Oman has awarded the 2717 Ferrovial-Federici Stirling Batco consortium a US$344.39 million (OMR 132.6 million) contract to construct a 41km section of Oman’s Batinah Expressway.

According to an Oman national newspaper the package, the fifth of six construction packages associated with the project includes three major bridge works taking the expressway across large wadis. The bridges will contain as many as 20 spans - each with a length of up to 40m.

Seen as vital for developing the region's economic potential, the265km-long Batinah Expressway is expected to reduce the travel time between Muscat and UAE border by at least an hour.

The expressway is an extension of the 53km-long Muscat Expressway (which was built by the Muscat Municipality).

For more information on companies in this article

Related Content

  • PERI's tall order in Mexico
    February 14, 2012
    The Baluarte Bridge (Puente Baluarte), part of a major highway project, ranks among the most outstanding infrastructure projects ever constructed in Mexico.
  • A road challenge for Zimbabwe
    November 8, 2023
    Construction work is finally underway for a major new highway link in Zimbabwe after many years of false starts.
  • Galliford Try aims to downsize its construction business
    April 25, 2019
    UK construction and infrastructure business Galliford Try is reviewing its construction business with a view to downsizing. “The review will reduce the size of the construction business, focusing on its key strengths in markets and sectors with sustainable prospects for profitability and growth, where we have a track record of success,” the company said in a written statement. “The board anticipates that this review will result in reduced profitability in the current year reflecting a reassessment of
  • Poland: S6 expressway and A2 motorway receive EU funding
    November 23, 2018
    Subsidies worth more than €228 have been granted by the European Union for the construction of the S6 expressway section to link Slupsk with Gdansk. Also, around €77 million from the EU has been granted for the A2 section between Warsaw and Minsk Mazowiecki. The S6 section will be almost 41km long and will cost over €470 million is expected to be completed in October 2021. The 15km A2 section is due to be ready in June 2020 at a total cost of €193 million.