Skip to main content

Femern opts for immersed tunnel for the Fehmarn Belt link

The company behind the proposed Fehmarn Belt link crossing the Baltic Sea between Denmark and Germany will create the link with an immersed tunnel, despite a new environmental survey showing that a drilled tunnel would be more environment-friendly.
September 18, 2013 Read time: 1 min
The company behind the proposed Fehmarn Belt link crossing the Baltic Sea between Denmark and Germany will create the link with an immersed tunnel, despite a new environmental survey showing that a drilled tunnel would be more environment-friendly.

4782 Femern say the survey shows that neither an immersed or drilled tunnel would have environmental consequences prohibiting approval in Denmark or Germany.

The immersed tunnel is also estimated to be €1.3 billion (DKK 9.7 billion) cheaper than a drilled tunnel.

Construction of the Fehmarn Belt link is due to begin in 2015, with completion earmarked for 2021. Crossing the Fehmarn Belt in the Baltic Sea, the 18km wide link will connect the German island of Fehmarn with the Danish island of Lolland.

For more information on companies in this article

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.
  • Positive finding for tunnel solution in Malta
    May 2, 2012
    A preliminary study on the proposed tunnel connecting the islands of Malta and Gozo has been carried out by Mott Macdonald. Mott Macdonald’s preliminary analysis of the Malta-Gozo undersea road link suggests that it would take 5-7 years to build a tunnel between the two islands. This report suggests a cost of €156-€492 million for a single bore three-lane tunnel on the shortest practical alignment route. Potentially, the project could be co-financed by the EU under the Cohesion Fund if a road tunnel link be