Skip to main content

Feasibility study of proposed US$4.52bn Sumatra-Malaysia undersea tunnel

A 17.5km undersea tunnel may be built to link Karimum Island in Sumatra's Riau and Kukup in Johor's Pontian (Malaysia). A memorandum of understanding (MoU) has been sealed by Pelalawan Regency of Indonesia's Riau Province and University Teknologi Malaysia (UTM) to study the tunnel’s feasibility. The Johor-Riau undersea tunnel link is expected to cost US$4.52 billion (MYR 15 billion). The build figure would be cheaper than an earlier proposal to construct the Dumai (Indonesia)-Malacca (Malaysia) bridge w
January 22, 2014 Read time: 1 min
A 17.5km undersea tunnel may be built to link Karimum Island in Sumatra's Riau and Kukup in Johor's Pontian (Malaysia).  

A memorandum of understanding (MoU) has been sealed by Pelalawan Regency of Indonesia's Riau Province and University Teknologi Malaysia (UTM) to study the tunnel’s feasibility.

The Johor-Riau undersea tunnel link is expected to cost US$4.52 billion (MYR 15 billion). The build figure would be cheaper than an earlier proposal to construct the Dumai (Indonesia)-Malacca (Malaysia) bridge worth around $13.306 billion (MYR 44.3 billion), Dean of UTM's Construction Research Alliance Professor Doctor Muhd Zaimi Abd Majid said.

Several bridges will also be constructed as part of the Johor-Riau Link project to link the undersea tunnel with islands off the Riau waters.

On top of that, the project's undersea construction would not affect the flow of commercial ships on the Straits of Malacca, added Professor Doctor Abd Majid.

Related Content

  • Trans-Sumatra Highway toll road project
    June 8, 2020
    The Trans-Sumatra Highway toll road project is being prioritised.
  • Key Indonesia bridge project proves unfeasible
    June 8, 2015
    Proposals to construct the Sunda Strait Bridge are not feasible, according to the Ministry of Energy and Mineral Resources of Indonesia. Safety risks from earthquakes, tsunami, high tides and extreme weather conditions make the project impractical. A US$75.46 million feasibility study was carried out for the project. This pointed out that the bridge is at a high risk from earthquakes and tsunamis due to its vicinity to the Anak Krakatoa volcano.
  • Malaysia's SMART tunnel
    April 27, 2012
    A series of stamps has been produced in Malaysia that focus on the innovative project to save capital Kuala Lumpur from both chronic traffic congestion and flooding during periods of high seasonal rainfall.
  • New Thames River bridge crossing proposed for UK capital London
    July 2, 2014
    Plans are once more being put forward for a new bridge spanning the River Thames in East London. The proposed structure is expected to cost in the region of €750 million (£600 million) to build and has been designed by Arup and HOK. The campaign for the new bridge is being led by the London Chamber of Commerce and Industry (LCCI), which says that there is a desperate need for an additional crossing. The campaign group also has the support of City Airport, which lies on the north side of the Thames and would