Skip to main content

FCC heads group that will build Toyo Tunnel in Colombia

Spanish environmental services, infrastructure and water group FCC has secured a €392 deal to design, build, operate and maintain the 10km Toyo Tunnel in Urabá Port, Colombia. The Government of Antioquia awarded the project to the consortium in which Madrid-based FCC has a 40% share and a group of local business people hold 60%. The tunnel is around 80km from Medellin, the capital of Colombia’s mountainous Antioquia province. The US$426 million contract is for 10 years, during which design and constru
November 6, 2015 Read time: 2 mins
Spanish environmental services, infrastructure and water group 4914 FCC has secured a €392 deal to design, build, operate and maintain the 10km Toyo Tunnel in Urabá Port, Colombia.

The Government of Antioquia awarded the project to the consortium in which Madrid-based FCC has a 40% share and a group of local business people hold 60%.

The tunnel is around 80km from Medellin, the capital of Colombia’s mountainous Antioquia province. The US$426 million contract is for 10 years, during which design and construction will take around seven and half years and the rest will be for operation and maintenance.

Once complete the Toyo Tunnel will be the longest of its kind in Colombia. It will substantially improve the connection between Medellín and the region of Urabá, includes over 40km of road and over 12km of tunnels. Journey time between Medellin and Urabá will be cut from the six hours to three and a half when using private vehicles.

The project, located between the municipalities of Giraldo and Cañasgordas, consists of building a new 41km two-lane road with a dual carriageway section.

Projects such as the Toyo Tunnel are part of the government’s Fourth Generation (4G) of the Road Concessions Programme.

4G involves 40 projects that will see around 8,000km of new roads with an investment of $25 billion over seven years. Luis Fernando Andrade Moreno, president of ANI, has said contracts will be let under a Public Private Partnership (PPP) approach.

For more information on companies in this article

Related Content

  • Asphalt plans silos increase efficiency, reduce waste
    April 10, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    May 8, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    March 21, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment. Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Consortium constructing challenging route in Chilean capital Santiago?
    January 29, 2014
    The concession package for the US$1.06 billion Américo Vespucio Oriente (AVO) expressway in Santiago, Chile looks set to be awarded to a consortium headed by OHL Concesiones Chile. OHL's proposal of a subsidy close to 20% of the project's cost beat Spanish group Cintra's bid, according to a report from Business News Americas. Of 15 companies that prequalified for the project, only OHL in an alliance with Sacyr Concesiones Chile and Cintra had submitted technical offers for the 40-year concession. Constructi