Skip to main content

Faroe Islands to have two new subsea tunnels by 2024

The Faroe Islands will have two new toll-financed subsea tunnels by 2024 after the Løgting parliament approved the Islands’ biggest ever public construction project. One of the tunnels, Eysturoyartunnelen, will connect the islands of Eysturoy and Streymoy, and the other, Sandoyartunnelen, will connect islands of Streymoy and Sandoy. The estimated cost of the tunnels are €140.63 million (DKK 1.05 billion) and €115.18 million (DKK 860 million) respectively.
April 17, 2014 Read time: 1 min
The Faroe Islands will have two new toll-financed subsea tunnels by 2024 after the Løgting parliament approved the Islands’ biggest ever public construction project. One of the tunnels, Eysturoyartunnelen, will connect the islands of Eysturoy and Streymoy, and the other, Sandoyartunnelen, will connect islands of Streymoy and Sandoy. The estimated cost of the tunnels are €140.63 million (DKK 1.05 billion) and €115.18 million (DKK 860 million) respectively.

Related Content

  • Delayed Hong Kong tunnel cost climbing
    March 4, 2016
    Costs are climbing for a new road tunnel connection in Hong Kong. After a reassessment on the Tseung Kwan O-Lam Tin tunnel (Tseung-Lam tunnel) development project, the project cost increased from US$1.05 billion to $1.92 billion. The expected completion time has also been delayed from 2020 to 2021. The 4.2km tunnel will feature two lanes. The project is intended to reduce traffic congestion in Tseung Kwan O area during peak hours. Hong Kong’s Transport and Housing Bureau hopes to obtain approval from the Fi
  • Danish-German Fehmarn Belt road and rail tunnel hits funding snag
    July 9, 2015
    A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
  • Five consortia line up for Denmark’s new Storstrøm Bridge project
    June 18, 2015
    The Danish government has shortlisted five consortia for construction of a new Storstrøm Bridge to replace an aging structure. The cost of the bridge connecting the Danish islands of Zealand and Falstser amounts to nearly €563 million (US$625.7 million) and the bridge will be financed by the government's Infrastructure Fund. Companies that qualified for the project are a joint venture consisting of Vinci Construction Grand ProjectsSAS, Hochtief Infrastructure GmbH and MT Højgaard; the consortium of St
  • Femern opts for immersed tunnel for the Fehmarn Belt link
    September 18, 2013
    The company behind the proposed Fehmarn Belt link crossing the Baltic Sea between Denmark and Germany will create the link with an immersed tunnel, despite a new environmental survey showing that a drilled tunnel would be more environment-friendly.