Skip to main content

Explosive demolition of US421 bridge over Ohio River

The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even
September 23, 2013 Read time: 2 mins
The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even using the same supports. This made the demolition particularly tricky due to the very close proximity of the new structure, now being used to carry traffic, to the old bridge. Traffic was halted during the explosive demolition, which was highly successful with the remnants of the old structure falling where planned and the new link being undamaged by the blasting work. With the old structure removed, the new and much wider bridge can now be slid directly over the old supports. This work will be carried out once the existing supports have been strengthened and modified. When the new link is in place over the supports, the restrictions on the size of vehicles using the bridge will then be lifted.

Thanks to 6755 Demolition News for alerting us to this story.

For more information on companies in this article

Related Content

  • Bridge repairs for Nepal
    April 30, 2012
    Repair work is underway in Nepal on a key bridge located on the Ratna Highway. The 117m bridge over the Bheri River links Surkhet and Dailekh was built in 1988 by a Chinese construction company and now required urgent repair. Work being carried out includes the removal of corrosion from truss sections using sand blasting and repainting to provide long term protection. Another major part of the repair involves raising the Eastern end of the bridge, which has damaged bolts and subsided due to overweight vehic
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b