Skip to main content

Explosive demolition of US421 bridge over Ohio River

The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even
September 23, 2013 Read time: 2 mins
The fourth and final section of the Milton-Madison Bridge in the US has now been demolished. This aged 740m long structure was no longer able to cope with the traffic volumes along the route and has been demolished to make way for a new bridge. The bridge connects the US states of Indiana and Kentucky and has provided a key traffic route for the busy US421 over the Ohio River for many years. In a rather innovative piece of engineering, the new bridge has been constructed alongside the old structure and even using the same supports. This made the demolition particularly tricky due to the very close proximity of the new structure, now being used to carry traffic, to the old bridge. Traffic was halted during the explosive demolition, which was highly successful with the remnants of the old structure falling where planned and the new link being undamaged by the blasting work. With the old structure removed, the new and much wider bridge can now be slid directly over the old supports. This work will be carried out once the existing supports have been strengthened and modified. When the new link is in place over the supports, the restrictions on the size of vehicles using the bridge will then be lifted.

Thanks to 6755 Demolition News for alerting us to this story.

For more information on companies in this article

Related Content

  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Key UK bridge project for A38
    October 29, 2024
    A key UK bridge project for the A38 over the HS2 route.
  • Hinergia bridge project finds federal funding
    March 27, 2017
    A budget worth nearly US$252 million will help pay for bridge design and construction work as well as bridge repair activities in 12 states across Nigeria. The budget has been approved by Nigeria’s Federal Executive Council (FEC). Meanwhile $475 million is being budgeted for the engineering and consultancy work required for the Second Niger Bridge that will connect the city of Asaba in Delta State with Onitsha in Anambra State. The new bridge is desperately required as the existing structure is in poor cond
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.