Skip to main content

Explosive demolition fells old bridge in Mississippi

A demolition contractor used 180kg of explosives to bring down an old bridge structure in the US state of Mississippi. The Big Ridge Road Bridge in D’Iberville was demolished as part of a project as part of a US$41 million project to construct a new interchange. Work on the interchange is expected to be complete in 2015. The work is being carried out for the Mississippi Department of Transportation.
June 23, 2014 Read time: 1 min
A demolition contractor used 180kg of explosives to bring down an old bridge structure in the US state of Mississippi. The Big Ridge Road Bridge in D’Iberville was demolished as part of a project as part of a US$41 million project to construct a new interchange. Work on the interchange is expected to be complete in 2015. The work is being carried out for the 1500 Mississippi Department of Transportation.

For more information on companies in this article

Related Content

  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Alabama bridge and highway project gets clearance
    September 2, 2019
    Environmental clearance has been awarded by the US Federal Highway Administration (FHWA) for the Interstate 10 Mobile River Bridge and Bayway project.
  • New bridge installed in UK over busy rail line
    January 12, 2016
    Work to install a new bridge for the UK’s busiest rail freight line has been carried out over the A160 at the Port of Immingham. The project forms part of the Port of Immingham Improvement Scheme, a €118.15 million (£88.4 million) series of works being carried out on behalf of Highways England. The project involves upgrading 5km of the A160 from single carriageway to dual carriageway, and constructing a number of new structures. Because of the volume of rail traffic using the stretch of track, the new bridg