Skip to main content

€954.13mn for Ukravtodor to repair 7,700kms of Ukraine roads in 2014

A total of €954.13 million will be spent repairing 7,700kms of Ukraine’s roads during 2014, according to Yevgeny Prusenko, head of the state agency of automobile roads of Ukraine (Ukravtodor). Prusenko said the agency, who will carry out all repair works, will be fixing 3,600km of regional public roads and 4,100km of communal roads.
August 14, 2013 Read time: 1 min
A total of €954.13 million will be spent repairing 7,700kms of Ukraine’s roads during 2014, according to Yevgeny Prusenko, head of the state agency of automobile roads of Ukraine (2780 UkrAvTodor).

Prusenko said the agency, who will carry out all repair works, will be fixing 3,600km of regional public roads and 4,100km of communal roads.

For more information on companies in this article

Related Content

  • Permanent repairs at lower costs thanks to JCB’s revolutionary PotholePro machine
    December 15, 2021
    Shock figures from the AA reveal more than £11bn-worth of potholes need repairing across the UK and British digger maker JCB is on a mission to fix them.
  • New Zealand road repair programme planned
    November 8, 2019
    New Zealand is planning a programme of road repairs from now until March 2020. Over 1,200km of roads will be repaired under the plans.
  • Brazilian bridge and highway project tenders
    April 7, 2014
    A series of major project tenders are opening in Brazil. The Brazilian Government has announced five new road tenders to be launched in 2014. The highway sections run for a total distance of some 2,625km. This programme of works will lengthen the country’s highway network by some 2,282km, with the work costing an impressive US$7.39 billion in all.
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th