Skip to main content

Ethiopia road construction deals

Ethiopia is to benefit from a series of road upgrade and road construction projects with a total value of some US$2.51 billion. So far 58 separate road contracts have been awarded by the Ethiopian Roads Authority (ERA). The contracts vary, with some being for the construction of new roads and others for upgrading work, including surfacing rural dirt roads with asphalt.
September 27, 2017 Read time: 1 min

Ethiopia is to benefit from a series of road upgrade and road construction projects with a total value of some US$2.51 billion. So far 58 separate road contracts have been awarded by the Ethiopian Roads Authority (ERA). The contracts vary, with some being for the construction of new roads and others for upgrading work, including surfacing rural dirt roads with asphalt. In all the work will see work to a total of 3,287km of roads and in nine states. The value of the road upgrade programme is around four times greater than that of the previous financial year, when 17 projects were completed.

Related Content

  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained.