Skip to main content

Estructuracion Vial’s designs for US$5.15bn Colombian road projects

The National Infrastructure Agency (ANI) in Colombia has awarded a contract to the Estructuracion Vial consortium to carry out the designs and studies for six road projects worth a combined US$5.15 billion (COP9.75 trillion). Part of the Fondo de Adaptacion programme, the six road schemes include Bogota-Bucaramanga; Bucaramanga-Pamplona; Duitama-Pamplona-Cucuta; Norte de Santander (including Ocana-Astilleros and Cucuta-Puerto Santander); Transversales Cusiana-Carare-Boyaca (including Puerto Araujo-Tunja-
October 15, 2013 Read time: 1 min
The National Infrastructure Agency (ANI) in Colombia has awarded a contract to the Estructuracion Vial consortium to carry out the designs and studies for six road projects worth a combined US$5.15 billion (COP9.75 trillion).

Part of the Fondo de Adaptacion programme, the six road schemes include Bogota-Bucaramanga; Bucaramanga-Pamplona; Duitama-Pamplona-Cucuta; Norte de Santander (including Ocana-Astilleros and Cucuta-Puerto Santander); Transversales Cusiana-Carare-Boyaca (including Puerto Araujo-Tunja-Puerto Gaitan as well as Tunja-Chiquinquira-Puerto Boyaca); and Manizales-Honda-Villeta.

The Estructuracion Vial consortium comprises Anas, Progin and C&M Consultores.

Related Content

  • Asphalt plans silos increase efficiency, reduce waste
    May 8, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    March 21, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment. Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Colombian road developments benefit from budget
    July 2, 2019
    A new budget for road development works has been set for Colombia’s Arauca, Boyaca, Casanare, Cundinamarca, and Santander departments. Improving road links has been set as a priority by the Colombian Government. For the 10 year period from 2019 to 2029, some US1.2 billion is being budgeted for developing road infrastructure as well as tourism facilities in the respective departments. Of this budgets, around 2/3rds will be provided by the Colombian Government. Local authorities will be expected to provide th
  • New Colombian highways being built
    April 26, 2021
    New Colombian highways are being built at present.