Skip to main content

England’s A14 project River Great Ouse Viaduct completed

Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
February 28, 2019 Read time: 2 mins
The River Great Ouse Viaduct stretches for 0.8km

Construction of the biggest bridge in 8100 Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed.

The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line.

Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both directions.

Willie McCormick, construction director for the A14 project said the programme calls for 34 new bridges which will cater for around 85,000 vehicles a day along the bypass. “We’ve already opened nine of these to traffic, but around three-quarters of the work we are doing is off the existing road network and unseen to drivers,” he said. “We’re over half way through delivering the new A14.”

Around 64 pillars are needed to carry the viaduct over the River Ouse floodplain, each around 2m wide and embedded up to 30m in the ground. The pillars support the 17 spans of steel beams and concrete slabs which form the bridge deck. When the new A14 fully opens by December 2020, the bridge will help to reduce journey times on the road by up to 20 minutes.
 
Highways England said that working in an on-site prefabrication yard helped the team complete the viaduct structural work for €4.6 million less than anticipated by using more traditional methods. It also made it safer for the workforce with less time spent working at height.  

The A14 upgrade was the subject of a key project report in World Highways issue June 2018.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false false%>

For more information on companies in this article

Related Content

  • Kubota announces new Chinese diesel engine factory in Wuxi City
    February 15, 2013
    Japanese engine manufacturer Kubota will use Bauma to announce its plan to build another engine plant in Wuxi City, China for the production of vertical-shaft diesel engines. This facility has 18,000 m2 of manufacturing space and will be a fully-owned subsidiary of Kubota China Holdings Co. Production levels will reach 97,000 engines a year and operations start in 2014. Once opened, Kubota will have 6 manufacturing plants around the world for diesel engines.
  • A future UK government should focus more on potholes and road safety
    April 10, 2015
    With a national UK election looming next month, a future government must make road safety a top priority, said the Institute of Advanced Motorists (IAM). Half of motorists in a recent survey of 2,156 people, and conducted IAM in March, said the current administration has not given the issue as much attention as is needed. The number one issue that the government should be focussing on, according to 70% of respondents, is the reduction of the number of potholes. The backlog of repairs now tops more
  • E&E Event 2018 in Berlin: an asphalt industry fit for purpose
    May 15, 2018
    The provisional programme is now available for this year’s Euroasphalt and Eurobitume Event in Berlin. June 14-15. The focus of E&E 2018 will be on the preparations needed by the asphalt industry to ensure that it is fit for purpose in the future. Important strategic issues will be explored, some of which were highlighted in the E&E Congress 2016. These include the increasingly stringent economic aspects of supply and demand, the growing environmental issues over highway construction and use, health
  • Building capacity on data in African nations, Tanzania and Senegal
    May 21, 2019
    Improving road safety is a key development priority for Africa