Skip to main content

England’s A14 project River Great Ouse Viaduct completed

Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
February 28, 2019 Read time: 2 mins
The River Great Ouse Viaduct stretches for 0.8km

Construction of the biggest bridge in 8100 Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed.

The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line.

Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both directions.

Willie McCormick, construction director for the A14 project said the programme calls for 34 new bridges which will cater for around 85,000 vehicles a day along the bypass. “We’ve already opened nine of these to traffic, but around three-quarters of the work we are doing is off the existing road network and unseen to drivers,” he said. “We’re over half way through delivering the new A14.”

Around 64 pillars are needed to carry the viaduct over the River Ouse floodplain, each around 2m wide and embedded up to 30m in the ground. The pillars support the 17 spans of steel beams and concrete slabs which form the bridge deck. When the new A14 fully opens by December 2020, the bridge will help to reduce journey times on the road by up to 20 minutes.
 
Highways England said that working in an on-site prefabrication yard helped the team complete the viaduct structural work for €4.6 million less than anticipated by using more traditional methods. It also made it safer for the workforce with less time spent working at height.  

The A14 upgrade was the subject of a key project report in World Highways issue June 2018.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false http://www.worldhighways.com/categories/measurement-survey-design-software/features/upgrading-a-busy-a-road-link-in-the-uk/ false false%>

For more information on companies in this article

Related Content

  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Algeria to engage Japanese government over dispute with Cojaal
    January 14, 2015
    The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal, In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.
  • France tops Eurobitume’s European bitumen consumption table
    November 20, 2017
    Among European countries, France consumed the most bitumen in 2016, using over 2.2 million tonnes of the black stuff, according to figures from Eurobitume. The recent 2016 Eurobitume Bitumen Consumption Statistics for Europe shows that bitumen consumption across all grades for Europe as a whole was 11,274 million tonnes in 2016.
  • VIDEO: Queens University Belfast set record with Meccano bridge
    October 8, 2015
    A British university’s Big Bridge Build project has set a world record for the largest Meccano structure. Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock. The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.