Skip to main content

Drivers surprised by building demolition

Drivers on a busy route in the US city of Fort Lauderdale had an unwelcome surprise when a building was demolished just a short distance away. The structure was brought crashing down just 23m from the busy A1A road link. The local authorities however had provided no warning that the demolition work would occur. A change in the work methods used resulted in the old Howard Johnson hotel being quickly demolished, generating a large cloud of dust that obscured visibility for drivers on the route. Both drivers a
February 25, 2014 Read time: 1 min
Drivers on a busy route in the US city of Fort Lauderdale had an unwelcome surprise when a building was demolished just a short distance away. The structure was brought crashing down just 23m from the busy A1A road link. The local authorities however had provided no warning that the demolition work would occur. A change in the work methods used resulted in the old Howard Johnson hotel being quickly demolished, generating a large cloud of dust that obscured visibility for drivers on the route. Both drivers and local residents have complained over the late change in working methods and the lack of warnings given.

Related Content

  • Cape Cod bridge replacements planned
    May 30, 2022
    Key Cape Cod bridge replacement projects are planned.
  • Yotta’s Horizons and Mayrise create a route map of the world
    September 14, 2016
    Simon Topp, director of international business at software developer Yotta, explained the need for having the best possible plan in place. Highways agencies and departments the world over face a raft of complex and difficult challenges when it comes to managing and maintaining their infrastructure assets. In some countries, where natural disasters or extreme weather events are endemic, good asset management will need to be supplemented by risk and resilience planning. In the US, for example, the Feder
  • The Lessons of the Genoa bridge collapse
    April 23, 2019
    The partial collapse of the Polcevera viaduct, better known as the Morandi Bridge, has prompted debate regarding the technical and administrative aspects of maintaining road infrastructures. We discussed it with the engineer Gabriele Camomilla, former Director of Research and Maintenance of the Società Autostrade, who coordinated the only major structural intervention performed on the bridge, carried out in the early 1990s
  • High quality paving has been achieved at the Silverstone race track
    April 6, 2020
    Contractor Tarmac helped provide a high-quality surface for the UK’s famous Silverstone F1 racetrack, with the help of sophisticated technology from Topcon Positioning and Volz Consulting