Skip to main content

Drainage for new Wear Crossing in UK

In the UK the Lanes Group is carrying out the contract to build specialist drainage for the New Wear Bridge in Sunderland. The Lanes Group will carry out this work for the joint venture partners building the new bridge link.
January 21, 2016 Read time: 2 mins
The new Wear bridge will improve transport connections around Sunderland
RSSIn the UK the 7891 Lanes Group is carrying out the contract to build specialist drainage for the New Wear Bridge in Sunderland. The Lanes Group will carry out this work for the joint venture partners building the new bridge link.

Personnel based at the Lanes depot in Newcastle have begun carrying out drainage work for the €152.7 million (£117.6 million) bridge project. This is the second major bridge building project Lanes Group has been contracted to work on in recent months. The company is also providing specialist drainage support for the Mersey Gateway Project, the new bridge spanning the River Mersey between Runcorn and Widnes.

The New Wear Bridge is being built across the River Wear between the districts of Wessington and Pallion, and is designed to improve transport links between Sunderland city centre, the Port of Sunderland, the A19 and the wider region.

The three-span cable stay bridge, which is due to open in spring 2018, will also open up new development sites at either end. Lanes Group won a competitive tender to become the sole drainage contractor for the joint venture partners, Farrans Construction and Victor Buyck Steel Construction. Tasks already carried out by personnel from Lanes include desilting drainage pipes and carrying out CCTV drainage surveys.

The New Wear Bridge will be 336m long and will have a central A-frame cable pylon rising to 105m.

For more information on companies in this article

Related Content

  • Steel sealed on Stonecutters Bridge
    February 6, 2012
    The stone mastic asphalt surface being laid on the bridge deck. The Stonecutters Bridge in Hong Kong, the second longest spanning cable stayed bridge in the world, is a dual three-lane crossing of the Rambler Channel. It utilises 33,500tonnes of structural steel in the bridge deck; 32,000m3 of concrete in the towers and 65 steel deck units relying on 224 cables. Effectively protecting the megastructure's deck from the weather extremes (monsoon rains and extreme heat in the summer) and the high levels of tra
  • Ethiopia’s new tolled highway opens
    June 21, 2019
    Ethiopia is now benefiting from a new tolled route, improving transport between Dire Dawa and Dewele.
  • Waterford bascule bridge delivery
    May 22, 2025
    Components for Waterford’s bascule bridge are being delivered.
  • What kind of future is there for road tolls?
    November 12, 2013
    Hugh Basham, transport strategy and policy director, UK and Ireland, at DHL Supply Chain, enters the ongoing global debate around the use of road tolls Road pricing has always polarised opinion. Whilst road users - who are already struggling to cope with high fuel prices and insurance premiums – may resent the additional expense, environmentalists and frequent drivers often welcome the introduction of tolls as offering an escape from gridlocked roads. Charging to use the road network isn’t a new phenomenon