Skip to main content

Dragados among six in the running for fourth Panama bridge deal

All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi
August 23, 2016 Read time: 3 mins
All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports.

The companies officially vying for the estimated US$1 billion contract are:

•    4761 Dragados

•    Consorcio CCB: Constructora Norberto 1305 Odebrecht, Odebrecht Engenharia e Construcao International

•    Consorcio 236 Hyundai, 3959 Sacyr JV

•    Consorcio 1324 Astaldi – 3088 Daelim

•    Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engineering Company

•    Consorcio Cuarto Puente CSCEC – CREC – GLF:  5711 China State Construction Engineering Corporation, 890 China Railway Group

The bridge is likely to carry six vehicle lanes and two for a Panama metro rail link.

President Juan Carlos Varela Rodríguez announced the intention to build a fourth bridge in February last year. Varela also said the government would move to expand to eight lanes the highway between the Bridge of the Americas and the district and town of Arraiján.

In June the government appointed the US engineering firm T.Y Lin International to start project managing construction of the fourth bridge. Lin had won an international tender for the work likely to cost around US$17 million. The announcement came just ahead of the opening by the Panama Canal Expansion authorities of a major project that widened the canal to allow canal use by ships with cargo capacity of up 20 TEU.

The first crossing to have been built is the Bridge of the Americas that spans the Pacific Ocean entrance to the canal. The bridge was designed by 5750 Sverdrup & Parcel and finished in 1962 at a cost of $20 million.

The second crossing, the Centennial Bridge, is also on the Pacific end of the canal and was opened in 2004 in an effort to ease congestion on the Bridge of the Americas. It also replaces it as part of the Pan-American Highway.

The third bridge over the Panama Canal, known as the Atlantic Bridge, is under construction in Colón and spans the Atlantic entrance to the Canal. The bridge was designed by China Communication Construction Company, consisting of HPDI and 1493 Louis Berger Group. Construction was started in January 2013 by the French company 3085 Vinci Construction Grands Projets and the bridge is expected to open later this year.

The Atlantic Bridge will be located 3 km north of the Gatun locks, near the city of Colon. The contract covers construction of a 1,050m cable-stayed concrete bridge carrying two lines of traffic in each direction, with a central span of 530m and pylons with a height of 212.5m. It will have a clearance of 75m above the canal. The Atlantic Bridge will be the longest concrete cable stayed bridge in the world with a central span of 530m, according to Vinci.

For more information on companies in this article

Related Content

  • Mexico: no extended bid deadline for La Raza-Indios contract
    August 5, 2015
    Despite concerns from infrastructure groups, the Mexican government will not to extend the deadline for bids for the design, construction, operation and maintenance of the La Raza-Indios Verdes-Santa Clara motorway. Mexico’s Secretariat of Communications and Transport said the deadline remains as August 24 for the contract which will be a 30-year public-private partnership estimated to worth around $364 million.
  • Mexican bridge celebration
    March 22, 2012
    Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world.
  • Consortium Via al Puerto to finish Colombia’s Buga-Buevantura road
    May 24, 2016
    Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway. Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years. Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais new
  • Chile approves construction of the Agua Negra project through the Andes
    August 13, 2015
    Plans for a cross-continent upgraded road were recently boosted when Chile’s senate approved construction of its share of a major US$1.6 billion tunnel in the Andes Mountains. The Chilean approval comes after the Argentinian government gave the nod in March for construction on its section of the Agua Negra project. A tender for specific design work could be put out by September, according to the Argentinian newspaper Diario de Cuyo. The approvals resolve a number of bilateral issues including taxation