Skip to main content

Dragados among six in the running for fourth Panama bridge deal

All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi
August 23, 2016 Read time: 3 mins
All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports.

The companies officially vying for the estimated US$1 billion contract are:

•    4761 Dragados

•    Consorcio CCB: Constructora Norberto 1305 Odebrecht, Odebrecht Engenharia e Construcao International

•    Consorcio 236 Hyundai, 3959 Sacyr JV

•    Consorcio 1324 Astaldi – 3088 Daelim

•    Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engineering Company

•    Consorcio Cuarto Puente CSCEC – CREC – GLF:  5711 China State Construction Engineering Corporation, 890 China Railway Group

The bridge is likely to carry six vehicle lanes and two for a Panama metro rail link.

President Juan Carlos Varela Rodríguez announced the intention to build a fourth bridge in February last year. Varela also said the government would move to expand to eight lanes the highway between the Bridge of the Americas and the district and town of Arraiján.

In June the government appointed the US engineering firm T.Y Lin International to start project managing construction of the fourth bridge. Lin had won an international tender for the work likely to cost around US$17 million. The announcement came just ahead of the opening by the Panama Canal Expansion authorities of a major project that widened the canal to allow canal use by ships with cargo capacity of up 20 TEU.

The first crossing to have been built is the Bridge of the Americas that spans the Pacific Ocean entrance to the canal. The bridge was designed by 5750 Sverdrup & Parcel and finished in 1962 at a cost of $20 million.

The second crossing, the Centennial Bridge, is also on the Pacific end of the canal and was opened in 2004 in an effort to ease congestion on the Bridge of the Americas. It also replaces it as part of the Pan-American Highway.

The third bridge over the Panama Canal, known as the Atlantic Bridge, is under construction in Colón and spans the Atlantic entrance to the Canal. The bridge was designed by China Communication Construction Company, consisting of HPDI and 1493 Louis Berger Group. Construction was started in January 2013 by the French company 3085 Vinci Construction Grands Projets and the bridge is expected to open later this year.

The Atlantic Bridge will be located 3 km north of the Gatun locks, near the city of Colon. The contract covers construction of a 1,050m cable-stayed concrete bridge carrying two lines of traffic in each direction, with a central span of 530m and pylons with a height of 212.5m. It will have a clearance of 75m above the canal. The Atlantic Bridge will be the longest concrete cable stayed bridge in the world with a central span of 530m, according to Vinci.

For more information on companies in this article

Related Content

  • New tunnel between Argentina and Chile proves strong attraction for contractors
    November 27, 2013
    Interest is strong in the project to build the 14km tunnel link between Chile and Argentina, with reports stating that 23 firms having expressed an interest in the work. The twin tube tunnel will connect Argentina’s San Juan Province with Chile’s Coquimbo Province (Region IV) and will be constructed in the Andes Mountains. The Agua Negra project is set to cost somewhere in the range from US$800 million to $1 billion, although the exact price of the project has yet to be determined. Some 72% of the link will
  • Special formwork solution for tricky Orinoco project
    April 24, 2013
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood plain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shape with the Venezuelan government investing in the showcase project at Caicara del Orinoco. The bridge will have an overall length of 11.125km on completion, which is scheduled for 2015. The main bridge is 2.28km long, and the roadway is 55m above
  • Brunie bridge building bids
    April 30, 2015
    Four Chinese contractors are involved in the bidding process for work on Brunei’s Temburong Bridge project. This is the second phase for the bridge project, as a local contractor, Swee, and a South Korean company, Daelim Industrial, won the tender process for the first phase of the work. There are five phases in all for the 30km Temburong Bridge project. In all the project is expected to cost some US$1.21 billion to construct. The names of all of the bidders for the second phase have not so far been release
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.