Skip to main content

Dragados among six in the running for fourth Panama bridge deal

All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi
August 23, 2016 Read time: 3 mins
All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports.

The companies officially vying for the estimated US$1 billion contract are:

•    4761 Dragados

•    Consorcio CCB: Constructora Norberto 1305 Odebrecht, Odebrecht Engenharia e Construcao International

•    Consorcio 236 Hyundai, 3959 Sacyr JV

•    Consorcio 1324 Astaldi – 3088 Daelim

•    Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engineering Company

•    Consorcio Cuarto Puente CSCEC – CREC – GLF:  5711 China State Construction Engineering Corporation, 890 China Railway Group

The bridge is likely to carry six vehicle lanes and two for a Panama metro rail link.

President Juan Carlos Varela Rodríguez announced the intention to build a fourth bridge in February last year. Varela also said the government would move to expand to eight lanes the highway between the Bridge of the Americas and the district and town of Arraiján.

In June the government appointed the US engineering firm T.Y Lin International to start project managing construction of the fourth bridge. Lin had won an international tender for the work likely to cost around US$17 million. The announcement came just ahead of the opening by the Panama Canal Expansion authorities of a major project that widened the canal to allow canal use by ships with cargo capacity of up 20 TEU.

The first crossing to have been built is the Bridge of the Americas that spans the Pacific Ocean entrance to the canal. The bridge was designed by 5750 Sverdrup & Parcel and finished in 1962 at a cost of $20 million.

The second crossing, the Centennial Bridge, is also on the Pacific end of the canal and was opened in 2004 in an effort to ease congestion on the Bridge of the Americas. It also replaces it as part of the Pan-American Highway.

The third bridge over the Panama Canal, known as the Atlantic Bridge, is under construction in Colón and spans the Atlantic entrance to the Canal. The bridge was designed by China Communication Construction Company, consisting of HPDI and 1493 Louis Berger Group. Construction was started in January 2013 by the French company 3085 Vinci Construction Grands Projets and the bridge is expected to open later this year.

The Atlantic Bridge will be located 3 km north of the Gatun locks, near the city of Colon. The contract covers construction of a 1,050m cable-stayed concrete bridge carrying two lines of traffic in each direction, with a central span of 530m and pylons with a height of 212.5m. It will have a clearance of 75m above the canal. The Atlantic Bridge will be the longest concrete cable stayed bridge in the world with a central span of 530m, according to Vinci.

For more information on companies in this article

Related Content

  • New Ohio River Bridge project on track
    February 3, 2014
    Plans are on track for the new Ohio River Bridge project in the US. Bilfinger Berger Global Infrastructure SIVAC has completed at acquisition of a 33.33% stake in this PPP project. The construction portion of the project will be handled through a joint venture between VINCI Construction Grand Projects and Walsh Construction. The PPP concession package involves designing, building, operating and maintaining a cable stayed bridge over the Ohio River. The work will also include constructing link roads and asso
  • Spanish road association opens highway award competition
    September 23, 2013
    The Spanish Road Association (FAEC) now opening its fifth International Award for Innovation in Highway Juan Antonio Fernández del Campo competition to entries. This biennial competition started in 2005 with the aim of promoting research and innovation in the road infrastructure sector. Spanish is used for the entrants as the language of international scientific reference. The prize can be awarded for various factors to a single person or teams of individuals, designers of projects, studies, for research or
  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on