Skip to main content

Design contract awarded for Indian bridge project

A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around
March 26, 2018 Read time: 2 mins

A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA)

The 22km link will be India's longest sea bridge and is expected to cost around US$2.31 billion to construct. This contract will include monitoring services during building, with work on the project expected to last from mid-2018 until late 2022. 

The bridge forms part of India's increased focus on building infrastructure to support the country's rapid economic growth. The link will cut travel time between Mumbai and Navi Mumbai by one hour and will also connect Nhava Sheva Port, the Mumbai-Goa Highway, the Mumbai-Pune Expressway and the Navi Mumbai International Airport, currently under construction. 

The bridge will traverse the Sewri Mudflats, Pir Pau Jetty and Thane Creek channels. In a first for India, the project will include orthotropic steel deck sections, crossing several navigation channels. 

Work is expected to start this month with an estimated construction time of around 40 months. COWI provided the tender design for a contractor joint venture consisting of Larsen & Toubro Ltd (L&T) from India and IHI from Japan. In 2017, the L&T-IHI JV was awarded the Design-Build contract for Package 1 of the project - the longest of the three packages. The Package 1 section of the project consists of an interchange connecting to the existing Eastern Highway in Mumbai and a combination of concrete box girder bridges and orthotropic steel box girder bridges. 

MMRDA has awarded contracts to a consortium of Larsen and Toubro (L&T) and Japan's IHI Corporation, a consortium of Daweoo and Tata Projects Limited (TPL), and L&T to construct the Sewri side of sea bridge (Package 1), the Navi Mumbai side of sea bridge (Package 2), and the bridge portion on land towards Chirle (Package 3), respectively.
 

Related Content

  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Kenya port suspension bridge project makes progress
    January 15, 2019
    A new suspension bridge in Kenya’s key port city, Mombasa, will help unlock potential – Shem Oirere reports Plans for the construction of a US$200 million suspension bridge in Kenya heva moved a notch higher. The country's urban roads agency recently announced the shortlisting of three bidders for the design, finance, construct, operate, maintain and transfer public private partnership (PPP) contract model. Kenya Urban Roads Authority (KURA) is a state agency that manages, develops, rehabilitates and mai
  • Mumbai sea link contract
    September 6, 2018
    The contract has been awarded for the Mumbai sea link project in India. The Versova-Bandra Sea Link Project is expected to cost US$987.6 million to build and is should take five years to construct. When complete the 17.7km bridge will be the longest sea crossing in India. The project will be handled by a consortium made up of Astaldi and Reliance Infrastructure under an engineering, procurement and construction package. The deal was awarded by the Maharashtra State Road Development Corporation.