Skip to main content

Design contract awarded for Indian bridge project

A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around
March 26, 2018 Read time: 2 mins

A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA)

The 22km link will be India's longest sea bridge and is expected to cost around US$2.31 billion to construct. This contract will include monitoring services during building, with work on the project expected to last from mid-2018 until late 2022. 

The bridge forms part of India's increased focus on building infrastructure to support the country's rapid economic growth. The link will cut travel time between Mumbai and Navi Mumbai by one hour and will also connect Nhava Sheva Port, the Mumbai-Goa Highway, the Mumbai-Pune Expressway and the Navi Mumbai International Airport, currently under construction. 

The bridge will traverse the Sewri Mudflats, Pir Pau Jetty and Thane Creek channels. In a first for India, the project will include orthotropic steel deck sections, crossing several navigation channels. 

Work is expected to start this month with an estimated construction time of around 40 months. COWI provided the tender design for a contractor joint venture consisting of Larsen & Toubro Ltd (L&T) from India and IHI from Japan. In 2017, the L&T-IHI JV was awarded the Design-Build contract for Package 1 of the project - the longest of the three packages. The Package 1 section of the project consists of an interchange connecting to the existing Eastern Highway in Mumbai and a combination of concrete box girder bridges and orthotropic steel box girder bridges. 

MMRDA has awarded contracts to a consortium of Larsen and Toubro (L&T) and Japan's IHI Corporation, a consortium of Daweoo and Tata Projects Limited (TPL), and L&T to construct the Sewri side of sea bridge (Package 1), the Navi Mumbai side of sea bridge (Package 2), and the bridge portion on land towards Chirle (Package 3), respectively.
 

Related Content

  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.
  • Trimble announces winners of BIM awards
    October 7, 2022
    Trimble is announcing the winners of its 2022 BIM awards.
  • VIDEO: Life in the (very) fast lane on Turkey’s Osman Gazi Bridge
    July 5, 2016
    Traffic was light for the reigning World SuperSport motorcycle champion Kenan Sofuoglo when he crossed the new Osman Gazi Bridge at 5a.m. last week. Which is just as well, because he topped out at 400kph on his specially prepared Kawasaki Ninja H2R after just 26 seconds, as the video shows. In fact, no other traffic was allowed on the new US$1.3 billion bridge, named after Osman Gazi, the founder and first sultan of the Ottoman Empire. Turkish media outlet TRTWorld reported that the bike had small win