Skip to main content

Denmark’s Roskilde Bridge officially opened

The official opening of Denmark’s new Roskilde Bridge has been carried out. The structure has been named Crown Princess Mary´s Bridge. The 1.3km structure is the first cantilevered bridge to be built in Denmark since 1970. Construction took 36 months and the work was completed three months ahead of schedule. The project posed some challenges to the engineers and designers as the construction work was subject to environmental restrictions. Because it lies close to a residential area and a summerhouse area,
October 1, 2019 Read time: 1 min

The official opening of Denmark’s new Roskilde Bridge has been carried out. The structure has been named Crown Princess Mary´s Bridge. The 1.3km structure is the first cantilevered bridge to be built in Denmark since 1970. Construction took 36 months and the work was completed three months ahead of schedule. The project posed some challenges to the engineers and designers as the construction work was subject to environmental restrictions.

Because it lies close to a residential area and a summerhouse area, there were strict controls over working noise, vibration, light and dust in addition to traffic restrictions.

This civil engineering work, is BESIX’s first project in Denmark. The Danish highways authority “Vejdirektoratet” awarded the €133 million contract to RBAI, a joint venture between BESIX, Rizzani de Eccher (Italy) and Acciona Infraestructuras (Spain) in 2016.

Related Content

  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • Norway halts E6 Storhove-Roterud near Lågen
    January 2, 2023
    Road agency Nye Veier received dispensation for construction of a motorway in the Lågen delta from the State Administrator last April but the work has run into environmental concerns
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.