Skip to main content

Denmark's Jutland bridge options

Cost concerns have entered the discussion arena for Denmark's proposed bridge linking the islands of Jutland and Funen.
February 29, 2012 Read time: 1 min
Cost concerns have entered the discussion arena for Denmark's proposed bridge linking the islands of Jutland and Funen. A new report from the Danish Ministry of Transport suggests that the cost for a new bridge could range from €804.76 million to €4.3 billion. The proposed link would be built across Denmark's Little Belt and the report says that the project would be profitable only after 2030 due to growing pressure on transport capacity. The future of the project is still open to discussion with three different strategies being analysed. One option is for a new direct link across the Kattegat between Jutland and Zealand. The second option is for a new bridge across the Little Belt close to the two existing bridges. The third option is for a connection to the north of the Little Belt, between Jutland and Zealand. Meanwhile a new survey carried out by the 2284 Danish Road Directorate for the Ministry of Transport shows that the best alternative for increasing motorway capacity between northern and southern Jutland would be to expand the present E45 motorway. The cost of this alternative would amount to €3.62 billion. The other alternative; a new motorway through central Jutland would be a considerably worse alternative, the report states.

For more information on companies in this article

Related Content

  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Positive finding for tunnel solution in Malta
    May 2, 2012
    A preliminary study on the proposed tunnel connecting the islands of Malta and Gozo has been carried out by Mott Macdonald. Mott Macdonald’s preliminary analysis of the Malta-Gozo undersea road link suggests that it would take 5-7 years to build a tunnel between the two islands. This report suggests a cost of €156-€492 million for a single bore three-lane tunnel on the shortest practical alignment route. Potentially, the project could be co-financed by the EU under the Cohesion Fund if a road tunnel link be
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • Sweden and Denmark consider link between Helsingør and Helsingborg
    July 2, 2018
    Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail. The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg. Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.