Skip to main content

Denmark: construction of Storstrøm Bridge officially gets underway

Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
September 27, 2018 Read time: 2 mins
Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge.


The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937.

The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.

Earlier this year the 2284 Danish Road Directorate - Vejdirektoratet - awarded the construction contract to an Italian joint venture of Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. The European Union will subsidise the work to around €15 million.

Danish civil engineering and infrastructure group Cowi was appointed as main design consultant in September 2016. Civil engineering and architectural firm Dissing+Weitling worked closely with Hasløv & Kjærsgaard, another Danish architecture studio, on design options.

The design is that of a “robust and simple structure” but which also appears “elegant and simple for those crossing or viewing the bridge”, according to Dissing+Weitling, the architectural firm involved in the project. The pier’s geometrical form complements the other bridges in the region, which include the Øresund Fixed Link, the Great Belt Link and the Farø Bridge.

For more information on companies in this article

Related Content

  • Shortlist set for Norway’s Sotra PPP project
    May 21, 2020
    Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.
  • World Road Meeting 2017
    April 16, 2018
    The IRF World Road Meeting 2017 was held recently – World Highways’ India correspondent Partha Pratim Basistha reports The 18th World Road Meeting of the International Road Federation took place between 14-17 November 2017 in the North Indian state of Uttar Pradesh at Greater Noida near India’s capital New Delhi. Close to 1500 delegates and visitors across the world - including India - from the road infrastructure fraternity participated at the global event. The Cross Roads meeting, coinciding with an ex
  • West Africa’s biggest bitumen plant
    September 19, 2019
    July saw the ceremonial sod cutting for a project to build West Africa’s biggest bitumen plant: a joint venture between Ghana’s oil company GOIL and Societe Multinationale de Bitumes (SMB) of the Ivory Coast. The project, which will cost around US$35 million according to GOIL, is in Tema Ghana. With a capacity of 8,000tonnes, it will produce AC10 and AC20 bitumen and polymer modified bitumen (PMB). Speaking at the ceremony, Ghana’s minister of energy John Peter Amewu said: “Due to the success of the PMB
  • Danish date for ViaTherm LongDot
    May 22, 2019
    Geveko Markings says that better visibility, reduction of noise and increased road safety are the benefits its new ViaTherm LongDot road marking. ViaTherm LongDot has been developed in collaboration with Vejdirektoratet - the Danish Road Directorate – and several of its partners within the highways sector, says Geveko. Road markings everywhere are based mainly on two types of markings. The ordinary flat road marking (Type I) and the structured profiled marking (Type II). Flat markings are noiseless