Skip to main content

Denmark: construction of Storstrøm Bridge officially gets underway

Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
September 27, 2018 Read time: 2 mins
Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge.


The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937.

The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.

Earlier this year the 2284 Danish Road Directorate - Vejdirektoratet - awarded the construction contract to an Italian joint venture of Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. The European Union will subsidise the work to around €15 million.

Danish civil engineering and infrastructure group Cowi was appointed as main design consultant in September 2016. Civil engineering and architectural firm Dissing+Weitling worked closely with Hasløv & Kjærsgaard, another Danish architecture studio, on design options.

The design is that of a “robust and simple structure” but which also appears “elegant and simple for those crossing or viewing the bridge”, according to Dissing+Weitling, the architectural firm involved in the project. The pier’s geometrical form complements the other bridges in the region, which include the Øresund Fixed Link, the Great Belt Link and the Farø Bridge.

For more information on companies in this article

Related Content

  • CISMA: French road construction market expected to rise
    January 17, 2018
    Construction and maintenance of roads in France is expected to grow again this year – by 3% - after several years of decline, according to CISMA. Aggregates production is also expected to be up around 3.5%, as well as civil engineering by 3%. Civil Engineering activity is recovering at last, notes CISMA, especially thanks to work in the Paris area. “Across the country, cities large and small have adopted the construction of modern tramways that has led to improved traffic circulation, more convenient
  • Sweden’s Tjörnbron Bridge to get replacement cables
    May 30, 2018
    SwedenSwedish contractor Svevia has been commissioned by the Swedish Transport Administration (Trafikverket) to handle cable replacements on the Tjörnbron Bridge. Replacement is expected to start in 2019 for completion by 2025. Svevia project manager Johan Söderberg said the work will be complicated, not least because traffic must continue to us the bridge. He reportedly said that much of the work will have to take place at night, in the summer and in good weather. The 664m-long cable stayed Tjörn Bridge,
  • Immersed tube Fehmarnbelt Tunnel approved
    February 21, 2012
    The Danish government has given its approval for the construction of the 18km immersed tube Fehmarnbelt Tunnel, which will connect the country with Germany.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o