Skip to main content

Denmark: construction of Storstrøm Bridge officially gets underway

Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
September 27, 2018 Read time: 2 mins
Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge.


The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937.

The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.

Earlier this year the 2284 Danish Road Directorate - Vejdirektoratet - awarded the construction contract to an Italian joint venture of Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. The European Union will subsidise the work to around €15 million.

Danish civil engineering and infrastructure group Cowi was appointed as main design consultant in September 2016. Civil engineering and architectural firm Dissing+Weitling worked closely with Hasløv & Kjærsgaard, another Danish architecture studio, on design options.

The design is that of a “robust and simple structure” but which also appears “elegant and simple for those crossing or viewing the bridge”, according to Dissing+Weitling, the architectural firm involved in the project. The pier’s geometrical form complements the other bridges in the region, which include the Øresund Fixed Link, the Great Belt Link and the Farø Bridge.

For more information on companies in this article

Related Content

  • Croatia’s Pelješac Bridge to open mid-year
    February 8, 2022
    China’s CRBC started construction on the bridge in 2019 amid concerns by European construction companies of price dumping.
  • England’s new Sunderland Bridge renamed Northern Spire
    December 12, 2017
    The new Sunderland Bridge - on track to open in the spring - was officially named Northern Spire during a recent event on the bridge. The official naming followed a week-long public vote in which 10,000 people chose their favourite name from an official list of three names. Northern Spire received almost half of the votes, according to bridge officials. The other names were Lumen Point (34% of votes) and The Prism which received 17%. The two-span cable-stayed bridge across the River Wear in northeast
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.