Skip to main content

Demolition starts on Seattle’s Alaska Way Viaduct

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
June 14, 2019 Read time: 2 mins
Coming down: Demolition of Seattle’s Alaska Way Viaduct, a 1950’s structure, began this winter (pic courtesy Philip Renaud)

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle in Washington State is underway, including the filling in of a redundant road tunnel.

Demolition contractor Kiewit Infrastructure West picked up the contract estimated at around US$94 million, according to media reports. Work is expected to take up to two years and includes filling in the Alaska Way’s Battery Street Tunnel.

For each segment of the viaduct, the contractor is removing the road decks, then girders and crossbeams and finally the support columns. During demolition, barriers are installed to protect nearby buildings and water is sprayed on the work to keep down dust.

Tunnel work includes decommissioning and removing the utility and mechanical systems, removal of hazardous material from the tunnel and, when finished, the sealing of the two entrances.

Kiewit decided against using conveyor belts to move the material into the Battery Street Tunnel. Instead, rubble is trucked to a nearby sorting area where rebar is removed. The material is crushed into small piece and loaded onto side-dumping trucks that carry the debris to openings along the tunnel route that lead directly down into the tunnel itself. The trucks dump the material into a steel funnel over the openings and down it goes into the tunnel. It takes less than a minute for the material to crash down into the tunnel where it is then levelled out by workers. Vibratory rollers spread and compact the material in layers.

Prior to the demolition work, there were public petitions to keep the Battery Street Tunnel open for pedestrian and bicycle use. However, the Washington State Department of Transportation decided that the structure, in need of repair,  would have been extremely expensive to upgrade to modern seismic standards – an important feature for any structure along the west coast of the US and up into Canada. The region lies along the infamous San Andreas Fault making it prone to earthquakes.

The new Alaska Way’s tunnel lies directly under the old viaduct and was the subject of a World Highways Key Project Report in 2017.

<%$Linker:

2

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

 

Related Content

  • NLMK is building its presence in North America
    January 6, 2017
    Belgian steel specialist NLMK said that it is developing its international sales for its high quality products. The firm said that it is having major success in reaching local machinery manufacturers in an array of countries and is building market share. The company offers a range of steels for different applications and specialises in thin plates, offering high tolerances on its plate thicknesses in comparison with its competitors. Niche markets where the company has developed a strong base include abrasio
  • Atlas 215LCsr gets cab overhaul
    January 6, 2017
    Atlas has updated the cab on its 215LCsr short tail swing excavator. The 21.8tonne crawler gets a revised electrical system along with a new steering column and operator’s seat. A Linde LS hydraulic system provides improved control for the operator. The 215LCsr is available with an adjustable boom or a monobloc boom, while the overall track width is just 2.2m for ease of transportation. Atlas has also launched a truck loading crane, the 440V CS, specifically for the US market. The 440V CS has a capacity o
  • XCMG in acquisition mode
    January 6, 2017
    XCMG is believed to be in advanced negotiations over the purchase of major concrete machinery manufacturer Schwing as part of its ambitious plans to break into the top three companies for construction machine sales by 2015. One company source said the acquisition of Germany-based Schwing would be a “big thing” for the global construction machinery industry. “We feel they can contribute to our competitiveness in the concrete machinery sector. Our lower manufacturing costs and their high level technology make
  • XCMG in acquisition mode
    April 17, 2012
    XCMG is believed to be in advanced negotiations over the purchase of major concrete machinery manufacturer Schwing as part of its ambitious plans to break into the top three companies for construction machine sales by 2015. One company source said the acquisition of Germany-based Schwing would be a “big thing” for the global construction machinery industry. “We feel they can contribute to our competitiveness in the concrete machinery sector. Our lower manufacturing costs and their high level technology make