Skip to main content

Demolition starts on Seattle’s Alaska Way Viaduct

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
June 14, 2019 Read time: 2 mins
Coming down: Demolition of Seattle’s Alaska Way Viaduct, a 1950’s structure, began this winter (pic courtesy Philip Renaud)

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle in Washington State is underway, including the filling in of a redundant road tunnel.

Demolition contractor Kiewit Infrastructure West picked up the contract estimated at around US$94 million, according to media reports. Work is expected to take up to two years and includes filling in the Alaska Way’s Battery Street Tunnel.

For each segment of the viaduct, the contractor is removing the road decks, then girders and crossbeams and finally the support columns. During demolition, barriers are installed to protect nearby buildings and water is sprayed on the work to keep down dust.

Tunnel work includes decommissioning and removing the utility and mechanical systems, removal of hazardous material from the tunnel and, when finished, the sealing of the two entrances.

Kiewit decided against using conveyor belts to move the material into the Battery Street Tunnel. Instead, rubble is trucked to a nearby sorting area where rebar is removed. The material is crushed into small piece and loaded onto side-dumping trucks that carry the debris to openings along the tunnel route that lead directly down into the tunnel itself. The trucks dump the material into a steel funnel over the openings and down it goes into the tunnel. It takes less than a minute for the material to crash down into the tunnel where it is then levelled out by workers. Vibratory rollers spread and compact the material in layers.

Prior to the demolition work, there were public petitions to keep the Battery Street Tunnel open for pedestrian and bicycle use. However, the Washington State Department of Transportation decided that the structure, in need of repair,  would have been extremely expensive to upgrade to modern seismic standards – an important feature for any structure along the west coast of the US and up into Canada. The region lies along the infamous San Andreas Fault making it prone to earthquakes.

The new Alaska Way’s tunnel lies directly under the old viaduct and was the subject of a World Highways Key Project Report in 2017.

<%$Linker:

2

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

 

Related Content

  • New Holland Construction launches new short radius excavators at bauma
    January 6, 2017
    New Holland Construction (NHC) is unveiling three short radius excavator models, the E230C SR, E260C SR and E160C Blade Runner (BR), at bauma. Featuring the company’s Tier 4 interim CEGR technology and unique iNDr system, these quiet short radius models are said to combine productivity with the ability to work in the tightest spaces, making them ideal for urban job sites and road construction work.
  • New Holland Construction launches new short radius excavators at bauma
    February 12, 2013
    New Holland Construction (NHC) is unveiling three short radius excavator models, the E230C SR, E260C SR and E160C Blade Runner (BR), at bauma. Featuring the company’s Tier 4 interim CEGR technology and unique iNDr system, these quiet short radius models are said to combine productivity with the ability to work in the tightest spaces, making them ideal for urban job sites and road construction work.
  • JCB is offering a new range of its JS crawler excavators
    January 6, 2017
    The new generation JS crawler excavators from JCB are said to deliver increased performance along with reduced running costs. The JS220, JS260 and JS360 are all powered by Isuzu diesels that meet the Tier 4 Interim/Stage IIIB emissions requirements with reduced fuel consumption and increased torque rise. For developing markets, there is also a Tier 2 compliant version of the JS220 powered by a JCB 448 Dieselmax engine with a similar output to the 129kW Isuzu diesel in the Tier 4 Interim/Stage IIIB model. Th
  • JCB is offering a new range of its JS crawler excavators
    April 11, 2012
    The new generation JS crawler excavators from JCB are said to deliver increased performance along with reduced running costs. The JS220, JS260 and JS360 are all powered by Isuzu diesels that meet the Tier 4 Interim/Stage IIIB emissions requirements with reduced fuel consumption and increased torque rise. For developing markets, there is also a Tier 2 compliant version of the JS220 powered by a JCB 448 Dieselmax engine with a similar output to the 129kW Isuzu diesel in the Tier 4 Interim/Stage IIIB model. Th