Skip to main content

Demolition starts on Seattle’s Alaska Way Viaduct

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
June 14, 2019 Read time: 2 mins
Coming down: Demolition of Seattle’s Alaska Way Viaduct, a 1950’s structure, began this winter (pic courtesy Philip Renaud)

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle in Washington State is underway, including the filling in of a redundant road tunnel.

Demolition contractor Kiewit Infrastructure West picked up the contract estimated at around US$94 million, according to media reports. Work is expected to take up to two years and includes filling in the Alaska Way’s Battery Street Tunnel.

For each segment of the viaduct, the contractor is removing the road decks, then girders and crossbeams and finally the support columns. During demolition, barriers are installed to protect nearby buildings and water is sprayed on the work to keep down dust.

Tunnel work includes decommissioning and removing the utility and mechanical systems, removal of hazardous material from the tunnel and, when finished, the sealing of the two entrances.

Kiewit decided against using conveyor belts to move the material into the Battery Street Tunnel. Instead, rubble is trucked to a nearby sorting area where rebar is removed. The material is crushed into small piece and loaded onto side-dumping trucks that carry the debris to openings along the tunnel route that lead directly down into the tunnel itself. The trucks dump the material into a steel funnel over the openings and down it goes into the tunnel. It takes less than a minute for the material to crash down into the tunnel where it is then levelled out by workers. Vibratory rollers spread and compact the material in layers.

Prior to the demolition work, there were public petitions to keep the Battery Street Tunnel open for pedestrian and bicycle use. However, the Washington State Department of Transportation decided that the structure, in need of repair,  would have been extremely expensive to upgrade to modern seismic standards – an important feature for any structure along the west coast of the US and up into Canada. The region lies along the infamous San Andreas Fault making it prone to earthquakes.

The new Alaska Way’s tunnel lies directly under the old viaduct and was the subject of a World Highways Key Project Report in 2017.

<%$Linker:

2

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

 

Related Content

  • Volvo CE’s earthmovers on film for promotion campaign
    October 25, 2018
    For its new publicity campaign, Volvo Construction Equipment has teamed up with film star hardman Dolph Lundgren to showcase its excavators’ endurance in a stunt-filled mini-movie entitled Pump It Up. In the tongue-in-cheek mini-movie Lundgren, whose credits include Rocky IV, Universal Soldier and The Expendables, plays an all-action drill instructor in an excavator boot camp determined to test the diggers to their limits. Excavators ranging from 1.5t to 95t are ordered to do press-ups, pull-ups, flip
  • Paul Verrico of Eversheds will be headline speaker at ERIC 2016
    August 9, 2016
    Despite Europe being a global leader in road safety, around 25,000 road users (working, walking, driving or riding a bicycle) did not make it home in 2015 and more than 200,000 others sustained life-changing or serious injuries. Leading Safety Lawyer Paul Verrico, a Partner of European law firm Eversheds will present the ERICLeeds16 ROAD SAFETY DEBATE. He will argue that organisations in the UK face ever increasing sanctions through new sentencing guidelines for health and safety and corporate manslaugh
  • Liebherr adds TA240 to ADT line-up
    January 6, 2017
    Liebherr has added a second model to its articulated hauler range with the TA240. The 40 tonne capacity truck has a 27m3 body and a 6x6 driveline. Power comes from a 16.2 litre Stage IIIB Liebherr V8 diesel engine delivering 350kW (476hp). This enables the truck to reach maximum speeds of up to 57km/h. A high performance retarder helps to bring the truck to a halt and can be preselected, with both the engine brake and the retarder working as soon as the driver lifts their foot from the throttle pedal. Wet,
  • Liebherr adds TA240 to ADT line-up
    February 8, 2013
    Liebherr has added a second model to its articulated hauler range with the TA240. The 40 tonne capacity truck has a 27m3 body and a 6x6 driveline. Power comes from a 16.2 litre Stage IIIB Liebherr V8 diesel engine delivering 350kW (476hp). This enables the truck to reach maximum speeds of up to 57km/h. A high performance retarder helps to bring the truck to a halt and can be preselected, with both the engine brake and the retarder working as soon as the driver lifts their foot from the throttle pedal. Wet,