Skip to main content

Demolition starts on Seattle’s Alaska Way Viaduct

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
June 14, 2019 Read time: 2 mins
Coming down: Demolition of Seattle’s Alaska Way Viaduct, a 1950’s structure, began this winter (pic courtesy Philip Renaud)

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle in Washington State is underway, including the filling in of a redundant road tunnel.

Demolition contractor Kiewit Infrastructure West picked up the contract estimated at around US$94 million, according to media reports. Work is expected to take up to two years and includes filling in the Alaska Way’s Battery Street Tunnel.

For each segment of the viaduct, the contractor is removing the road decks, then girders and crossbeams and finally the support columns. During demolition, barriers are installed to protect nearby buildings and water is sprayed on the work to keep down dust.

Tunnel work includes decommissioning and removing the utility and mechanical systems, removal of hazardous material from the tunnel and, when finished, the sealing of the two entrances.

Kiewit decided against using conveyor belts to move the material into the Battery Street Tunnel. Instead, rubble is trucked to a nearby sorting area where rebar is removed. The material is crushed into small piece and loaded onto side-dumping trucks that carry the debris to openings along the tunnel route that lead directly down into the tunnel itself. The trucks dump the material into a steel funnel over the openings and down it goes into the tunnel. It takes less than a minute for the material to crash down into the tunnel where it is then levelled out by workers. Vibratory rollers spread and compact the material in layers.

Prior to the demolition work, there were public petitions to keep the Battery Street Tunnel open for pedestrian and bicycle use. However, the Washington State Department of Transportation decided that the structure, in need of repair,  would have been extremely expensive to upgrade to modern seismic standards – an important feature for any structure along the west coast of the US and up into Canada. The region lies along the infamous San Andreas Fault making it prone to earthquakes.

The new Alaska Way’s tunnel lies directly under the old viaduct and was the subject of a World Highways Key Project Report in 2017.

<%$Linker:

2

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

 

Related Content

  • Innovative hybrid mixer developed by CIFA
    January 6, 2017
    CIFA is introducing an innovative hybrid truck mixer in the shape of its new Energya 9 model. This features a conventional 9m3 capacity mixer drum however the rotational drive system is electric and the machine is also equipped with a lithium ion type battery pack that is charged up while the truck is being driven, assisted by regenerative braking. When the mixer stops on-site, the drive to the drum is supplied either by the battery pack or can be plugged in to a mains power supply. This allows the truck dr
  • Innovative hybrid mixer developed by CIFA
    February 21, 2013
    CIFA is introducing an innovative hybrid truck mixer in the shape of its new Energya 9 model. This features a conventional 9m3 capacity mixer drum however the rotational drive system is electric and the machine is also equipped with a lithium ion type battery pack that is charged up while the truck is being driven, assisted by regenerative braking. When the mixer stops on-site, the drive to the drum is supplied either by the battery pack or can be plugged in to a mains power supply. This allows the truck dr
  • Tunnel development set for Englischer Garten in Munich, Germany
    December 7, 2016
    The German state of Bavaria will invest around €35 million in a road tunnel under the Englischer Garten in Munich. The city of Munich will have to find the rest of the expected €125 million construction cost for the 380m tunnel that will replace a motorway that splits the park. German media reports say that city authorities will look toward some form of private sponsorship for tunnel that would likely be a cut and cover design that would follow closely the current alignment of the highway. Englisch
  • Perlini Equipment for dump trucks
    January 6, 2017
    Perlini Equipment is one of the world's leading manufacturers of dump trucks – having sold over 12,000 of them worldwide since 1957. The firm currently offers machines up to a capacity of 95tonnes. Reliable and easy to drive, and with customised models available on request, the trucks are built with high quality Perlini original components, offering top-tier performance and fuel efficiency.