Skip to main content

Demolition starts on Seattle’s Alaska Way Viaduct

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
June 14, 2019 Read time: 2 mins
Coming down: Demolition of Seattle’s Alaska Way Viaduct, a 1950’s structure, began this winter (pic courtesy Philip Renaud)

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle in Washington State is underway, including the filling in of a redundant road tunnel.

Demolition contractor Kiewit Infrastructure West picked up the contract estimated at around US$94 million, according to media reports. Work is expected to take up to two years and includes filling in the Alaska Way’s Battery Street Tunnel.

For each segment of the viaduct, the contractor is removing the road decks, then girders and crossbeams and finally the support columns. During demolition, barriers are installed to protect nearby buildings and water is sprayed on the work to keep down dust.

Tunnel work includes decommissioning and removing the utility and mechanical systems, removal of hazardous material from the tunnel and, when finished, the sealing of the two entrances.

Kiewit decided against using conveyor belts to move the material into the Battery Street Tunnel. Instead, rubble is trucked to a nearby sorting area where rebar is removed. The material is crushed into small piece and loaded onto side-dumping trucks that carry the debris to openings along the tunnel route that lead directly down into the tunnel itself. The trucks dump the material into a steel funnel over the openings and down it goes into the tunnel. It takes less than a minute for the material to crash down into the tunnel where it is then levelled out by workers. Vibratory rollers spread and compact the material in layers.

Prior to the demolition work, there were public petitions to keep the Battery Street Tunnel open for pedestrian and bicycle use. However, the Washington State Department of Transportation decided that the structure, in need of repair,  would have been extremely expensive to upgrade to modern seismic standards – an important feature for any structure along the west coast of the US and up into Canada. The region lies along the infamous San Andreas Fault making it prone to earthquakes.

The new Alaska Way’s tunnel lies directly under the old viaduct and was the subject of a World Highways Key Project Report in 2017.

<%$Linker:

2

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

 

Related Content

  • Hydrema updates 912HM dump truck
    January 6, 2017
    Hydrema has revised its 912 range of articulated dump trucks, with a move from Perkins power to a Cummins Tier 4 Interim/Stage IIIB motor. The QSB4.5L engine delivers 105kW of power, up 8% on the previous model, but more importantly has 20% more torque, at 620Nm. Despite the increased output, Hydrema claims similar fuel consumption to the previous ADT line-up. The engine sits beneath a redesigned canopy that lifts clear of the chassis to provide easy access to the engine and driveline. The trucks also feat
  • A tunnelling jumbo has been developed by XCMG
    January 6, 2017
    XCMG’s TZ3 tunnelling jumbo represents another sign of the firm’s diversifying product line. This three boom jumbo drill is intended for duties in large tunnelling excavation projects. It features a ROPS-protected canopy and is a notable development for the firm as it is a sign of the company’s strategy to become a full line supplier, including underground excavation machinery. Its development highlights the firm’s widening machine portfolio, which has expanded well beyond its previous line-up.
  • A tunnelling jumbo has been developed by XCMG
    November 27, 2012
    XCMG’s TZ3 tunnelling jumbo represents another sign of the firm’s diversifying product line. This three boom jumbo drill is intended for duties in large tunnelling excavation projects. It features a ROPS-protected canopy and is a notable development for the firm as it is a sign of the company’s strategy to become a full line supplier, including underground excavation machinery. Its development highlights the firm’s widening machine portfolio, which has expanded well beyond its previous line-up.
  • VIDEO: Brazilian cyclists caught on camera drafting a truck
    January 18, 2016
    Just how dangerous is it for a cyclist to draft a fast moving vehicle? Probably very dangerous but that means only some cyclists will attempt it, as these videos shows. At the start of this video from Brazil, the cyclist on the right appears to attach his Go Pro camera to the rear of the truck that they are drafting. It is not until about 3:55 seconds into the video that the speed picks up and reaches reportedly 124kph. Near the end of the video, the one cyclist left appears to take back the camera off t