Skip to main content

Demolition starts on Seattle’s Alaska Way Viaduct

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
June 14, 2019 Read time: 2 mins
Coming down: Demolition of Seattle’s Alaska Way Viaduct, a 1950’s structure, began this winter (pic courtesy Philip Renaud)

Demolition of the Alaska Way Viaduct in the northwest US city of Seattle in Washington State is underway, including the filling in of a redundant road tunnel.

Demolition contractor Kiewit Infrastructure West picked up the contract estimated at around US$94 million, according to media reports. Work is expected to take up to two years and includes filling in the Alaska Way’s Battery Street Tunnel.

For each segment of the viaduct, the contractor is removing the road decks, then girders and crossbeams and finally the support columns. During demolition, barriers are installed to protect nearby buildings and water is sprayed on the work to keep down dust.

Tunnel work includes decommissioning and removing the utility and mechanical systems, removal of hazardous material from the tunnel and, when finished, the sealing of the two entrances.

Kiewit decided against using conveyor belts to move the material into the Battery Street Tunnel. Instead, rubble is trucked to a nearby sorting area where rebar is removed. The material is crushed into small piece and loaded onto side-dumping trucks that carry the debris to openings along the tunnel route that lead directly down into the tunnel itself. The trucks dump the material into a steel funnel over the openings and down it goes into the tunnel. It takes less than a minute for the material to crash down into the tunnel where it is then levelled out by workers. Vibratory rollers spread and compact the material in layers.

Prior to the demolition work, there were public petitions to keep the Battery Street Tunnel open for pedestrian and bicycle use. However, the Washington State Department of Transportation decided that the structure, in need of repair,  would have been extremely expensive to upgrade to modern seismic standards – an important feature for any structure along the west coast of the US and up into Canada. The region lies along the infamous San Andreas Fault making it prone to earthquakes.

The new Alaska Way’s tunnel lies directly under the old viaduct and was the subject of a World Highways Key Project Report in 2017.

<%$Linker:

2

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false https://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

 

Related Content

  • World pothole day to highlight road repair requirement
    March 20, 2015
    The response to the calls for the proposed National Pothole Day have been so strong that organiser Street Repairs is now planning a World Pothole Day. This will be on March 25th.
  • Liebherr’s HS8300HD crawler uses hybrid drive to reduce fuel consumption
    January 6, 2017
    Liebherr has developed a hybrid drive system for its HS8300HD heavy duty cycle crawler crane. The 350 tonne machine generates electrical power from its hydraulic free-fall winches, which offer up to 50 tonnes of line pull. Under this Pactronic system surplus energy is stored in a hydraulic accumulator and regenerated to assist the engine, reducing fuel consumption. This reuse of energy also cuts emissions from the machine.
  • Liebherr’s HS8300HD crawler uses hybrid drive to reduce fuel consumption
    February 7, 2013
    Liebherr has developed a hybrid drive system for its HS8300HD heavy duty cycle crawler crane. The 350 tonne machine generates electrical power from its hydraulic free-fall winches, which offer up to 50 tonnes of line pull. Under this Pactronic system surplus energy is stored in a hydraulic accumulator and regenerated to assist the engine, reducing fuel consumption. This reuse of energy also cuts emissions from the machine.
  • Ammann celebrates 150 years in its own special style
    March 13, 2019
    Ammann is 150 years old this year and the Swiss manufacturing group is celebrating in style with a special edition of its company magazine and an impressive stand at bauma 2019 in Munich. Please click on this link to find out exactly what is happening:http://digital.ropl.com/2019/AmmannGroup/home.html The Ammann story began in 1869 when founder Jakob Ammann set up his first workshop in Madiswil in Switzerland and it wasn't long before his brother Ulrich refocused the business from traditional millwork i