Skip to main content

Demolition of Seattle’s Alaskan Way Viaduct has started

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s
February 28, 2019 Read time: 2 mins

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel.

According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this summer.

Demolition of the viaduct will take around six months, according to the contractor Kiewit Infrastructure West. Once the viaduct is removed, work on a new Alaskan Way surface street will start the is expected to breath new economic life into the downtown core.

All the areas businesses including its well-known Pike Place Market and Pioneer Square will remain open.

In addition to viaduct demolition, Kiewit’s contract includes work to decommission and seal the Battery Street Tunnel. They will also reconnect John and Thomas streets across Aurora Avenue North, just north of the Battery Street Tunnel. Those streets have been closed to east-west crossings for more than 60 years. This work will involve lane reductions and closures near the new SR 99 tunnel’s north portal.

3260 World Highways
reported on-site during the final days of construction for the tunnel.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

For more information on companies in this article

Related Content

  • bauma innovation awards shortlist lines up 15 potential winners
    February 19, 2013
    bauma has announced the shortlist for its Innovation Awards 2013, which will be presented at the show in mid April. Speaking at the event’s giant media dialog in Munich at the end of January 29, Johann Sailer, President of the VDMA Construction Machinery and Building Materials Machinery Association revealed that the organisers had received 156 entries across the scheme’s five main categories.
  • D-TEC launches new sorting and demolition grapples
    January 6, 2017
    D-TEC has launched its new sorting and demolition grapples for the Asian market during bauma China 2012. The new range from the Dutch company is available for excavators from 0.7tonnes up to 50tonnes. Said to be made in its state-of-the-art production facility, the new D-TEC grapples feature Hardox wear parts; are low weight; have maximum load force; and offer easy maintenance for the operator. They are made to ISO 9001 standards.
  • D-TEC launches new sorting and demolition grapples
    November 30, 2012
    D-TEC has launched its new sorting and demolition grapples for the Asian market during bauma China 2012. The new range from the Dutch company is available for excavators from 0.7tonnes up to 50tonnes. Said to be made in its state-of-the-art production facility, the new D-TEC grapples feature Hardox wear parts; are low weight; have maximum load force; and offer easy maintenance for the operator. They are made to ISO 9001 standards.
  • ATS has great screen presence
    March 27, 2013
    ATS’ polyurethane wire mesh screens for industrial screenings are said to offer a wide range of advantages including long service life; easy handling; less pegging and blinding; and high screening performance with perfect undersize calibration during the screen’s working lifetime. In addition, the firm says its wire mesh screens have less sound emanating from them, while reducing the weight of the vibrating screen is said to have improved its operation. The ATS screens are equipped with hooks and fitted in