Skip to main content

Demolition of Seattle’s Alaskan Way Viaduct has started

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s
February 28, 2019 Read time: 2 mins

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel.

According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this summer.

Demolition of the viaduct will take around six months, according to the contractor Kiewit Infrastructure West. Once the viaduct is removed, work on a new Alaskan Way surface street will start the is expected to breath new economic life into the downtown core.

All the areas businesses including its well-known Pike Place Market and Pioneer Square will remain open.

In addition to viaduct demolition, Kiewit’s contract includes work to decommission and seal the Battery Street Tunnel. They will also reconnect John and Thomas streets across Aurora Avenue North, just north of the Battery Street Tunnel. Those streets have been closed to east-west crossings for more than 60 years. This work will involve lane reductions and closures near the new SR 99 tunnel’s north portal.

3260 World Highways
reported on-site during the final days of construction for the tunnel.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

For more information on companies in this article

Related Content

  • UK: Work starts on Mersey Gateway main bridge deck
    June 2, 2016
    Work has started on 2.2km Mersey Gateway’s main bridge deck as the project enters its third year of construction. The new six-lane toll bridge will link the English towns of Runcorn and Widnes and teams will begin to connect the steel support cables to the deck and upper pylons this summer. Trinity, the project’s movable scaffolding system (MSS), has cast the first 250m of the north approach viaduct and a new MSS is on its way to Halton to build the south approach viaduct. The local road network is al
  • Stantec wins upgrade to Florida SR 91
    July 29, 2019
    Canadian contractor Stantec is to lead design work for a 16km upgrade and widening of State Road 91 in the US state of Florida. Work will turn the section of road through Lake County into price-managed lanes for improved travel reliability, according to the company which will be working for Florida’s Turnpike Enterprise, part of the Florida Department of Transportation. Turnpike Enterprise operates a 740km-system of limited access toll highways Stantec’s design for the project, with a construction cos
  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.
  • Oregon’s electric vehicles cruise the West Coast Electric Highway
    December 3, 2014
    Many US states offer cash-back deals and tax breaks to encourage people to buy more electric vehicles. But Oregon has shunned financial incentives and opted to drive up EV sales through increasing the number of recharging stations.