Skip to main content

Demolition of Seattle’s Alaskan Way Viaduct has started

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s
February 28, 2019 Read time: 2 mins

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel.

According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this summer.

Demolition of the viaduct will take around six months, according to the contractor Kiewit Infrastructure West. Once the viaduct is removed, work on a new Alaskan Way surface street will start the is expected to breath new economic life into the downtown core.

All the areas businesses including its well-known Pike Place Market and Pioneer Square will remain open.

In addition to viaduct demolition, Kiewit’s contract includes work to decommission and seal the Battery Street Tunnel. They will also reconnect John and Thomas streets across Aurora Avenue North, just north of the Battery Street Tunnel. Those streets have been closed to east-west crossings for more than 60 years. This work will involve lane reductions and closures near the new SR 99 tunnel’s north portal.

3260 World Highways
reported on-site during the final days of construction for the tunnel.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

For more information on companies in this article

Related Content

  • Chengyu makes tracks for worldwide market
    January 6, 2017
    Chinese undercarriage component manufacturer Chengyu Machinery Equipment has set its sights on increasing exports to world markets. The company makes track rollers, carrier rollers, idlers, sprockets and track chain assemblies for machines from two to 40tonnes and exports 60% of its output. It said its products are crack- and abrasion-resistant and with high quality control procedures – only 25 parts in a million fail its quality control. Both its product delivery and after-sales service levels are said to
  • Chengyu makes tracks for worldwide market
    April 22, 2013
    Chinese undercarriage component manufacturer Chengyu Machinery Equipment has set its sights on increasing exports to world markets. The company makes track rollers, carrier rollers, idlers, sprockets and track chain assemblies for machines from two to 40tonnes and exports 60% of its output. It said its products are crack- and abrasion-resistant and with high quality control procedures – only 25 parts in a million fail its quality control. Both its product delivery and after-sales service levels are said to
  • Bentley Systems calls for submissions to 2016 Be Inspired Awards
    June 2, 2016
    Bentley Systems, a global provider of software solutions for advancing infrastructure, has announced a call for submissions to the 2016 Be Inspired Awards programme. The deadline for entries is June 10, 2016. The awards, which are selected by independent juries of industry experts, recognise the extraordinary work of organisations that help advance the world’s infrastructure by designing, engineering, constructing, delivering, and/or operating safer, more resilient, sustainable, and intelligent roads,
  • Montabert launches new medium range breaker
    January 6, 2017
    Hydraulic breaker manufacturer Montabert is launching a new medium range breaker for applications in demolition, roadbuilding, utilities and trenching. Weighting 730kg and working with a maximum input power of 33kW, it is said to offer exceptional power to weight ratio and is made for excavators from 8-18tonnes. The breaker features a completely new design with fewer parts and without tie rods, and provides a frequency of 870 blows/minute and can be used with excavators providing a flow range of 80-140litre