Skip to main content

Demolition of Seattle’s Alaskan Way Viaduct has started

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s
February 28, 2019 Read time: 2 mins

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel.

According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this summer.

Demolition of the viaduct will take around six months, according to the contractor Kiewit Infrastructure West. Once the viaduct is removed, work on a new Alaskan Way surface street will start the is expected to breath new economic life into the downtown core.

All the areas businesses including its well-known Pike Place Market and Pioneer Square will remain open.

In addition to viaduct demolition, Kiewit’s contract includes work to decommission and seal the Battery Street Tunnel. They will also reconnect John and Thomas streets across Aurora Avenue North, just north of the Battery Street Tunnel. Those streets have been closed to east-west crossings for more than 60 years. This work will involve lane reductions and closures near the new SR 99 tunnel’s north portal.

3260 World Highways
reported on-site during the final days of construction for the tunnel.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

For more information on companies in this article

Related Content

  • bauma presents a new traffic concept
    March 12, 2013
    Anybody who knows bauma, will also know how busy it can get on the way to and from the show, both on the roads and on public transportation. So, to make travel as easy as possible for the exhibitors and visitors to this, the world´s biggest trade show, Messe München has developed a new traffic concept, featuring remote parking areas. From the airport to bauma The airport shuttle is a non-stop bus service taking participants straight from the international airport at Munich (stopping at Terminal 1 and Termin
  • IJM backs out of deal to buy Malaysian road operator SILK
    November 25, 2014
    IJM, one of Malaysia’s largest construction conglomerates, has bailed out of a deal to buy the highways concession business SILK. SILK Holdings, owner of the subsidiary SILK, Sistem Lingkaran-Lebuhraya Kajang, and IJM agreed to end the US$118 million takeover deal that was announced in June, the Sun newspaper reported. SILK holds the concession for the 37km Kajang Traffic Dispersal Ring Road, also called the Silk Highway, until 2037. The road opened in 2004. IJM noted in June, in its filing of intention
  • Powerscreen’s Warrior 2400 screen goes on show
    January 6, 2017
    Mobile crushing, screening and washing equipment provider Powerscreen will exhibit some of its most popular equipment, including the Powerscreen Warrior 2400 screen.
  • Powerscreen’s Warrior 2400 screen goes on show
    March 1, 2012
    Mobile crushing, screening and washing equipment provider Powerscreen will exhibit some of its most popular equipment, including the Powerscreen Warrior 2400 screen.