Skip to main content

Demolition of Seattle’s Alaskan Way Viaduct has started

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s
February 28, 2019 Read time: 2 mins

Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel.

According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this summer.

Demolition of the viaduct will take around six months, according to the contractor Kiewit Infrastructure West. Once the viaduct is removed, work on a new Alaskan Way surface street will start the is expected to breath new economic life into the downtown core.

All the areas businesses including its well-known Pike Place Market and Pioneer Square will remain open.

In addition to viaduct demolition, Kiewit’s contract includes work to decommission and seal the Battery Street Tunnel. They will also reconnect John and Thomas streets across Aurora Avenue North, just north of the Battery Street Tunnel. Those streets have been closed to east-west crossings for more than 60 years. This work will involve lane reductions and closures near the new SR 99 tunnel’s north portal.

3260 World Highways
reported on-site during the final days of construction for the tunnel.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false http://www.worldhighways.com/categories/road-highway-structures/features/bertha-ends-her-alaskan-way-voyage-in-seattle/ false false%>

For more information on companies in this article

Related Content

  • Bauma 2016 Innovation Awards entries accepted starting today
    April 1, 2015
    Entries are now open for the bauma Innovation Awards to be presented at the international construction and construction equipment trade fair bauma in Munich in 2016. As last time, in 2016 the awards are again being presented in five categories: • Machinery • Components • Construction process/Construction work • Research • Design bauma 2016 in Munich is a major international showcase for construction machinery, building material machines, mining machines, construction vehicles and c
  • Video: Passenger car gives a lift to a white van in Spain
    December 23, 2015
    Maybe the driver of the Ford Focus passenger vehicle didn’t notice at first that he had a white van on the roof of the car. Or maybe he did, as the video, taken this year, shows. However, police in the Spanish town didn’t take kindly to either the driver of the passenger car or the person taking the video, according to media reports.
  • JTD aims for six Jakarta toll roads to start in 2015
    October 31, 2014
    Jakarta Tollroad Development (JTD) has said it aims to start construction of the six Jakarta inner city toll roads in the middle of next year. The project, nearly 70km in total and much of it elevated, is at the detailed engineering design stage. The toll roads will connect all five of Jakarta’s municipalities. The first construction stage involving the Semanan-Sunter-Pulogebang toll road is expected to US$1.20 billion. Total cost for the whole project is estimated at up to $3.2 billion. According to
  • The European Union Road Federation (ERF) calls for EU Member States to prioritise road maintenance
    August 12, 2014
    The European Union Road Federation (ERF) has put out an “urgent” call for “EU Member States to prioritise road maintenance” as neglected surfaces continue to deteriorate and the potholes grow larger and larger. ERF wants the EU to “put alternative financing mechanisms into place” as soon as possible, to tackle what it sees as a growing road safety crisis across the region.