Skip to main content

Debating the future of the Forth bridge

A debate is now underway regarding the fate of the existing Forth Road Bridge in the Scottish capital Edinburgh. A new Forth Replacement Bridge is being planned at a cost of some €2.64 billion and once this opens, it will carry heavy vehicles, which will not be allowed over the current bridge. Excessive loading and corrosion have taken their toll on the current bridge, although measures to halt the cable corrosion in this suspension bridge have now been taken.
May 14, 2012 Read time: 2 mins
A debate is now underway regarding the fate of the existing Forth Road Bridge in the Scottish capital Edinburgh.

A new Forth Replacement Bridge is being planned at a cost of some €2.64 billion and once this opens, it will carry heavy vehicles, which will not be allowed over the current bridge. Excessive loading and corrosion have taken their toll on the current bridge, although measures to halt the cable corrosion in this suspension bridge have now
been taken.

When the new link opens, there are proposals to turn the existing bridge into a pedestrian and cycleway only, although there are questions over the high maintenance costs for such use.

Overall though, the fate of the Forth Road Bridge provides a case in point for all older bridges around the world. The existing bridge was designed in the 1950s and built to high engineering standards, opening to traffic in 1964. However the bridge now has to cope with considerably higher volumes of traffic than it was designed for. In addition, the maximum GVW of trucks using the bridge has more than doubled since the link was opened.

Related Content

  • Amey wins Severn Bridge maintenance deal
    August 20, 2020
    Amey will manage two other structures apart from the 1.6km-long M48 Severn Bridge.
  • Lighting innovations boosting brightness, cutting costs
    January 27, 2014
    CU Phosco’s new P850 LED main road lantern has just seen its first major deployment – between Junctions 16 and 17 of the A55, a strategic road which skirts the North Wales coastline – Jason Barnes reports The A55 is a grade-separated dual carriageway also known as the North Wales Expressway. Some 139km long, it originally ran from Chester to Bangor but was extended across the Isle of Anglesey into Holyhead Docks in 2001 under a project part-funded by the European Union.
  • Lindsay argues the case for reversible lanes over adding lanes
    June 26, 2018
    Build new lanes or use existing lanes more effectively? In a recent US study* commissioned by Lindsay Transportation Solutions, the company argues the case for reversible lanes. The level of future uncertainty in transportation planning - specifically in addressing congestion on urban freeways - has increased significantly over the past few years. The impact of connected and autonomous vehicles on traffic flow, of Mobility as a Service (MaaS) initiatives, particularly the car-sharing elements, and exciting
  • UK Government announcing new road widening programme
    November 11, 2014
    The UK Government looks set to announce a major programme of road widening and improvement work. In all some €19.1 billion (£15 billion) is planned to be invested in around 100 large road projects. One of the key projects planned is for a new tunnel on the A303, close to the famous Stonehenge site. The tunnel will measure up to 2.9km long and will carry four lanes of traffic past the Stonehenge site. This tunnel has been proposed and cancelled on a number of previous occasions and has long been recognised a