Skip to main content

Debating the future of the Forth bridge

A debate is now underway regarding the fate of the existing Forth Road Bridge in the Scottish capital Edinburgh. A new Forth Replacement Bridge is being planned at a cost of some €2.64 billion and once this opens, it will carry heavy vehicles, which will not be allowed over the current bridge. Excessive loading and corrosion have taken their toll on the current bridge, although measures to halt the cable corrosion in this suspension bridge have now been taken.
May 14, 2012 Read time: 2 mins
A debate is now underway regarding the fate of the existing Forth Road Bridge in the Scottish capital Edinburgh.

A new Forth Replacement Bridge is being planned at a cost of some €2.64 billion and once this opens, it will carry heavy vehicles, which will not be allowed over the current bridge. Excessive loading and corrosion have taken their toll on the current bridge, although measures to halt the cable corrosion in this suspension bridge have now
been taken.

When the new link opens, there are proposals to turn the existing bridge into a pedestrian and cycleway only, although there are questions over the high maintenance costs for such use.

Overall though, the fate of the Forth Road Bridge provides a case in point for all older bridges around the world. The existing bridge was designed in the 1950s and built to high engineering standards, opening to traffic in 1964. However the bridge now has to cope with considerably higher volumes of traffic than it was designed for. In addition, the maximum GVW of trucks using the bridge has more than doubled since the link was opened.

Related Content

  • Switzerland’s new tunnel bore being built
    April 19, 2018
    A major new road tunnel project is being constructed in Switzerland – Mike Woof writes Construction work is now underway in Switzerland for the new Belchen Tunnel bore, a project that has resulted from the country’s long-term infrastructure planning. The building of this latest tunnel is important for Switzerland economically as it will deliver an upgraded link for a major transport infrastructure connection. When it is complete, the tunnel will form part of the vital A2 route between Basel, in the north
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Safety issues fuel interest at PIARC’s tunnel conference in Lyon
    June 4, 2019
    Alternative fuel and automated vehicle issues occupied minds at PIARC’s first international road tunnel safety conference. David Arminas reports from Lyon More than ever, tunnel management must done in a wholistic fashion, said Andre Broto, president of PIARC, the World Road Association, based in Paris. With those sentiments, Broto kicked off PIARC’s first International Conference on Tunnel Operations and Safety. One of the first speakers, Sandrine Bernabei Chinzi, head of transport infrastructure at Fr
  • Mobile River Bridge project proposed
    April 13, 2021
    A new proposal for the Mobile River Bridge project has been put forward.