Skip to main content

Damaged Norwegian bridge undergoes successful demolition

A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
February 23, 2015 Read time: 2 mins
A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to 8006 Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to remove the damaged structure instead.

The collapse of the structure has prompted questions as to the safety of other bridges in Norway and it has since transpired that checks carried out previously may have been insufficient. The slippage that spelled the fate of the Skjeggestad Bridge was related to the presence of a type clay, which can become unstable when under stress and in the presence of water.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 20623 0 oLinkInternal visit this page Norwegian bridge collapse prompts further investigations false /categories/road-highway-structures/news/norwegian-bridge-collapse-prompts-further-investigations/ false false%>

For more information on companies in this article

Related Content

  • Yanmar will show complete line of Tier 4 Final engines, along with an electronic diagnostic system
    February 7, 2013
    Engine supplier Yanmar will show a full range of California Air Resources Board (CARB) certified engines at Bauma. The company claims to be the first engine manufacturer to achieve the CARB accreditation across its complete line-up in the 19-56kW (25-75hp) range, and the engines all meet the US Tier 4 Final standard too. The firm will also announce an electronic diagnostic service system called Smart Assist-Direct. The system allows rapid updates of engine software and can automatically retrieve technical s
  • Sheep in the city
    May 22, 2019
    Christmas follies Christmas congestion was caused in Cambridgeshire due to an errant Santa. Traffic was forced to halt on a busy stretch of road in the town of Wisbech after an inflatable Santa was blown from the house where it had been secured. The giant Santa inflatable came to rest on Cromwell road, lying on its side and appearing to wave drunkenly at vehicles passing in the opposite lane. Two men then managed to remove the giant inflatable from the roadway, allowing vehicles to pass. And an overze
  • Kubota announces new Chinese diesel engine factory in Wuxi City
    January 6, 2017
    Japanese engine manufacturer Kubota will use Bauma to announce its plan to build another engine plant in Wuxi City, China for the production of vertical-shaft diesel engines. This facility has 18,000 m2 of manufacturing space and will be a fully-owned subsidiary of Kubota China Holdings Co. Production levels will reach 97,000 engines a year and operations start in 2014. Once opened, Kubota will have 6 manufacturing plants around the world for diesel engines.
  • Kubota announces new Chinese diesel engine factory in Wuxi City
    February 15, 2013
    Japanese engine manufacturer Kubota will use Bauma to announce its plan to build another engine plant in Wuxi City, China for the production of vertical-shaft diesel engines. This facility has 18,000 m2 of manufacturing space and will be a fully-owned subsidiary of Kubota China Holdings Co. Production levels will reach 97,000 engines a year and operations start in 2014. Once opened, Kubota will have 6 manufacturing plants around the world for diesel engines.