Skip to main content

Damaged Norwegian bridge undergoes successful demolition

A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
February 23, 2015 Read time: 2 mins
A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to 8006 Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to remove the damaged structure instead.

The collapse of the structure has prompted questions as to the safety of other bridges in Norway and it has since transpired that checks carried out previously may have been insufficient. The slippage that spelled the fate of the Skjeggestad Bridge was related to the presence of a type clay, which can become unstable when under stress and in the presence of water.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 20623 0 oLinkInternal visit this page Norwegian bridge collapse prompts further investigations false /categories/road-highway-structures/news/norwegian-bridge-collapse-prompts-further-investigations/ false false%>

For more information on companies in this article

Related Content

  • Matest Asphalt Splitter will make life easier for lab technicians
    January 6, 2017
    Materials testing firm Matest has launched an asphalt splitter at bauma. The machine breaks up asphalt specimens so that the constituent parts can be tested, a task that is often carried out by hand. “The purpose of the machine is to make the operator’s life easier,” said area manager Massiono Martorini. The splitter should also lead to greater efficiency, as breaking specimens down will take less time, and allow laboratory technicians to do other things. Matest expects to sell the splitter to laboratories
  • Matest Asphalt Splitter will make life easier for lab technicians
    April 19, 2013
    Materials testing firm Matest has launched an asphalt splitter at bauma. The machine breaks up asphalt specimens so that the constituent parts can be tested, a task that is often carried out by hand. “The purpose of the machine is to make the operator’s life easier,” said area manager Massiono Martorini. The splitter should also lead to greater efficiency, as breaking specimens down will take less time, and allow laboratory technicians to do other things. Matest expects to sell the splitter to laboratories
  • Pfreundt presents prototype wheeled loader weigh system
    February 12, 2013
    German company Pfreundt, a provider of weighing systems, is presenting a prototype for a new wheeled loader weighing system, which has initially been outfitted for markets in developing countries, for intralogistics and for agriculture and forestry. The new scale’s features include connection to the new Pfreundt web portal, self-assembly and calibration by dealers or customers, and a touch-screen with a simple, intuitive interface, similar to smartphones. Market launch is scheduled for 2014.
  • Getech’s versatile sludge treatment solution
    April 5, 2013
    Due to an innovative and strong frame design and the use of premium raw materials and components, Getech/Gennaretti centrifuges can be employed across mining, tunnelling, petroleum and chemical industry-based sludge treatment processes. They can also be built in mobile plants on containers, easy to transport to remote areas and quick to install, able to manage sludge volumes going from 5 to 150m³ per hour.