Skip to main content

Damaged Norwegian bridge undergoes successful demolition

A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to
February 23, 2015 Read time: 2 mins
A demolition team has successfully demolished the damaged southern lane of the Skjeggestad Bridge in Norway. Located in Vestfold, the bridge was damaged some weeks ago when the ground around its foundations slipped. The explosive demolition project was technically challenging due to the proximity of the bridge carrying the northern lanes but did go to plan according to 8006 Norway’s Public Roads Administration (NPRA). Initial plans to repair the Skjeggestad Bridge proved impractical and the decision was made to remove the damaged structure instead.

The collapse of the structure has prompted questions as to the safety of other bridges in Norway and it has since transpired that checks carried out previously may have been insufficient. The slippage that spelled the fate of the Skjeggestad Bridge was related to the presence of a type clay, which can become unstable when under stress and in the presence of water.

For more information, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 20623 0 oLinkInternal visit this page Norwegian bridge collapse prompts further investigations false /categories/road-highway-structures/news/norwegian-bridge-collapse-prompts-further-investigations/ false false%>

For more information on companies in this article

Related Content

  • Atlas and Mantsinen announce strategic partnership
    April 14, 2013
    German company Atlas Maschinen and Finnish group Mantsinen have formed a new strategic partnership that will include technical cooperation covering the manufacturing of hydraulic material-handling machines and R&D. Atlas has its head office in Delmenhorst and plants in Ganderkesee and Vechta, while Mantsinen’s principal place of business is in Ylämylly, Finland.
  • Hazemag’s secondary impact crusher HSI 1414
    February 13, 2013
    HAZEMAG says it has combined two successful impact crusher series into a single one and thus increase efficiency in the secondary crushing. The new HAZEMAG HSI 1414, with a completely revised design, follows the principle of the platform strategy, which means “one housing – several options.“ “The customer may opt between different impact aprons and rotor types. Hence HAZEMAG increases the crusher’s efficiency. Within the modularly designed platform the grinding path, for example, may simply and easily (even
  • Major Chinese bridge innovation event
    December 13, 2012
    Interest is strong in the Bridge Innovation Summit 2013 (BIS2013) being held from April 25th- 26th in Beijing, according to the event organisers. The Bridge Innovation Summit 2013 will be the leading event for bridge developments in Asia, with over 20 top executives as speakers and over 150 senior executives as participants. Confirmed leading bridge related companies and organisations include Arup, BAOSTEEL Construction, COWI, China Communications Construction Company (CCCC), China Railway Group and China’s
  • High mobility is claimed for CIFA’s concrete plant
    February 7, 2013
    High mobility is claimed for CIFA’s mobile concrete batching plant, the CIFAMOBILE 50. “This is the first ever CIFA concrete batching plant we’ve built. It’s highly mobile and can be transported on wheels,” said Marco Brambati, director of marketing and business planning at the firm. The machine features a mixer that can produce 1/3 of concrete/cycle. This DNA 1.0 mixer is the smallest in the CIFA range (while the largest has a 3m3 capacity) and can deliver up to 50m3/hour of ready-mixed concrete. The plant