Skip to main content

D8 highway in Czech Republic delayed

Completion of the final stretch of the D8 highway in the Czech Republic will be delayed. The 4.7km section of highway in the Czech region of Usti Nad Labem Oldrich Bubenicek will not be built by 2015 as planned originally. A landslide that occurred near Litochovice in June 2013 is the reason for the delay. Additional geotechnical surveys now have to be carried out before work can commence to to repair the damage cause by the landslide. It is possible that the results of the survey work will show that the ro
September 19, 2013 Read time: 2 mins
Completion of the final stretch of the D8 highway in the Czech Republic will be delayed. The 4.7km section of highway in the Czech region of Usti Nad Labem Oldrich Bubenicek will not be built by 2015 as planned originally. A landslide that occurred near Litochovice in June 2013 is the reason for the delay. Additional geotechnical surveys now have to be carried out before work can commence to to repair the damage cause by the landslide. It is possible that the results of the survey work will show that the route of the highway will have to be changed. In the worst case, this could delay completion of the section of highway by up to 10 years. The D8 is intended to link Czech capital Prague with the German border and is an important economic route for the country, so the survey work has been placed as a high priority by the country's Transport Ministry.

Related Content

  • Concern is being shown over the state of Czech bridges
    August 2, 2012
    An inspection carried out by German specialists has highlighted technical issues with five bridges in the Czech city of Ostrava. The Czech Road and Motorway Headquarters (RSD) has said that a more comprehensive study will be required before the type of repairs needed can be identified and a programme of works established. There have been questions over the scope and accuracy of the one day inspection however.
  • Moscow-Kazan highway plans
    June 17, 2020
    The Moscow-Kazan highway plans form part of the nation’s future economic recovery.
  • Czech capital ring road revision proposed
    August 22, 2017
    Revisions are being put forward for the ring road project around Czech capital Prague. An alternative route has been proposed and this has received initial approvals, so that further analysis of the plans can be carried out. The 10km stretch of ring road will now cost around €1.53 billion, a reduction of around 33% from the original alignment. The project for the new route will include the construction of a number of bridge sections and will be shorter than the first plan. A study will be carried out into t
  • Czech highway connection finally gets go-ahead
    February 28, 2012
    A long running land dispute in the Czech Republic has finally been settled, which will allow a key road link to be built after years of delay.