Skip to main content

D8 highway in Czech Republic delayed

Completion of the final stretch of the D8 highway in the Czech Republic will be delayed. The 4.7km section of highway in the Czech region of Usti Nad Labem Oldrich Bubenicek will not be built by 2015 as planned originally. A landslide that occurred near Litochovice in June 2013 is the reason for the delay. Additional geotechnical surveys now have to be carried out before work can commence to to repair the damage cause by the landslide. It is possible that the results of the survey work will show that the ro
September 19, 2013 Read time: 2 mins
Completion of the final stretch of the D8 highway in the Czech Republic will be delayed. The 4.7km section of highway in the Czech region of Usti Nad Labem Oldrich Bubenicek will not be built by 2015 as planned originally. A landslide that occurred near Litochovice in June 2013 is the reason for the delay. Additional geotechnical surveys now have to be carried out before work can commence to to repair the damage cause by the landslide. It is possible that the results of the survey work will show that the route of the highway will have to be changed. In the worst case, this could delay completion of the section of highway by up to 10 years. The D8 is intended to link Czech capital Prague with the German border and is an important economic route for the country, so the survey work has been placed as a high priority by the country's Transport Ministry.

Related Content

  • New highway connection between Montenegro and Bosnia
    September 23, 2014
    New highway links between Montenegro and Bosnia will make major improvements in transport links for the two countries. Bosnia Herzogovina plans to build its 110km stretch of the Adriatic-Ionic highway that will connect with Montenegro. Meanwhile in Montenegro, plans are in hand for the first stretch of the Bar-Boljare highway. The Bosnian Government is finalising the route for the Adriatic-Ionic highway, based on an earlier feasibility study. This route is of prime importance for the region as it will conne
  • Road safety concern for Portugal, Norway, Czech Republic, Bulgaria
    September 11, 2024
    Road safety is seeing worrying standards for Portugal, Norway, the Czech Republic and Bulgaria.
  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la
  • Late delivery for Lagos to Ibadan highway upgrade
    November 22, 2018
    Completion of the Lagos to Ibadan highway upgrade in Nigeria will not occur until 2021. The improvement work was initially to have been delivered by 2017. However a string of delays to the work have resulted from insufficient funds and from contractors leaving the jobsite. The current Nigerian Government has now cleared the debts for the project. Around 50% of the highway upgrade has been carried out so far. The contractor Reynolds Construction Company is working on a section from the Sagamu Interchange to